| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-05-01 (Accepted). Agency page | Dec 31, 2026 in 46 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $297,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 98 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 126,513 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1142 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1144). Agency page | Dec 31, 2034 in 2968 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 2, 2026 | Unknown CLASS - 2 AT THE TIME OF INSPECTION, I OBSERVED A SIDEWALK SHED ERECTED AT A 14-STORY OCCUPIED BUILDING. RESEARCH OF DOB NOW AND BIS RECORDS INDICATES SIDEWALK SHED PERMIT #M01246471-I1-SH EXPIRED ON 02/25/2026 AND HAS N #39558673K | Dec 24, 2026 PENDING | $1,250 |
| Sep 2, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION OF A 14-STORY BUILDING, NO SIGN OF CONSTRUCTION ACTIVITIES SIDEWALK SHED ERECTED EXP#1 DURING MY INSPECTION I NOTICED SIDEWALK SHED HAS NO INFORMATION OR BUILDING INFORMATION PANEL, TH #39558672Z | Dec 24, 2026 PENDING | $1,250 |
| Apr 22, 2026 | Unknown CLASS - 2 NOTE: AT TIME OF INSPECTION, I OBSERVED SIDEWALK IN PLACE AT EXPOSURES# 1, UPON REVIEWING DEPARTMENT RECORDS (BIS/DOBNOW), IT WAS FOUND THAT THE SIDEWALK SHED PERMIT (M01246471) WAS EXPIRED ON 02/25/2026. AN AC #39553318N | Jul 2, 2026 DEFAULT | $0 |
| Apr 2, 2026 | Unknown CLASS - 2 OBSERVED CONSTRUCTION SIDEWALK SHED AT EXPOSURE ONE, PERMIT WAS EXPIRED. M01246471-I1-SHEXPIRE 02/25/2026.FAILED TO RENEW PERMIT IN CONTRARY WITH 28-105.2 CLASSIFICATION OF WORK PERMITS SECTION 8 TEMPORARY CONS #39552534N | Jun 11, 2026 ADMIT/IN-VIO | $0 |
| May 20, 2024 | Unknown CLASS - 2 VIOLATING DETAILS: FAILURE TO PROVIDE PARAPET JOBS SIGN PANEL. NOTE: A TIME OF INSPECTION. OBSERVED. AT MAIN ENTRANCE EXPOSURE 1 SIDEWALK SHED IN PLACE WITHOUT PROJECT INFORMATION PANEL., SIDEWALK SHED PARAPET #39114784X | Jul 25, 2024 DEFAULT | $10,000 |
| May 20, 2024 | Unknown CLASS - 2 VIOLATING DETILS:PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS,PLATFORM NEEDS TO BE TIGH TO FACADE NOTE: TIME OF INSPECTION I OBSERVED SIDEWALK SHED IN PLACE. NOT TIGHT AND SEALED TO FACADE OF THE BUI #39114779L | Jun 12, 2025 IN VIOLATION | $2,500 |
| May 20, 2024 | Unknown CLASS - 2 AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED. WITH THE FOLLOWING OBJECTIONS. PLANKS ROTTING AWAY. AND RED LIGHT FOR FIRE DEPARTMENT CONNECTION. STANDPIPE. NOT TURNED ON. ALL PHOTOSENSORS SHALL BE EQUIPPED FOR #39114776X | Jun 12, 2025 IN VIOLATION | $2,500 |
| Nov 6, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION, AT PREMISES, A 14 STORY MULTIPLE DWELLING WITH 147 A UNITS, WITH A PERMITTED FACADE JOB IN PROGRESS AT EXTERIOR - GC #M08012718, LANDMARKS CERTIFICATE OF NO EFFECT #CNE-23-01649 - ACCESS #39098858M | Jan 11, 2024 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00340 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #01988 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #01989 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #01990 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #02578 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jan 31, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 29, 2019 | B | Apt 14D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL (APPROXIMATELY 10 SQ.FT) IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 14D, 14th STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 2, 2019 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Sep 2, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION, I OBSERVED A SIDEWALK SHED ERECTED AT A 14-STORY OCCUPIED BUILDING. RESEARCH OF DOB NOW AND BIS RECORDS INDICATES SIDEWALK SHED PERMIT #M01246471-I1-SH EXPIRED ON 02/25/2026 AND HAS N | Open |
| Sep 2, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OF A 14-STORY BUILDING, NO SIGN OF CONSTRUCTION ACTIVITIES SIDEWALK SHED ERECTED EXP#1 DURING MY INSPECTION I NOTICED SIDEWALK SHED HAS NO INFORMATION OR BUILDING INFORMATION PANEL, TH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)