7 floors · 70 apartments · 172,199 sq ft · built 2021 · class RM · owner of record: The New York Dock Building Condominium
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 119 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 172,199 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 515). Agency page | Dec 31, 2035 in 3354 days | Next due 2035 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 24, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR DOB VIO23-02311., COMPLY WITH COMMISSIONER'S ORDER; HIRE NYSPE TO SUBMIT REPORT TO EXECUTIVEINSPECTIONS@BUILDINGS.NYC.GOV WITHIN 30 DAYS, ADDRESSIN #39205538Y | Dec 2, 2026 PENDING | $2,500 |
| Aug 26, 2026 | Construction CLASS - 2 WORK WITHOUT PERMIT, I OBSERVED 80% OF BATHROOM REMOVED IN APARTMENT 6B2, ALL WATER SUPPLY AND WASTE PIPING HAVE BEEN REMOVED FROM SHOWER AND SINK WITH NO PERMITS ON FILE IN THE DOB SYSTEM., OBTAIN ALL PERMITS #39201866P | Nov 4, 2026 PENDING | $1,250 |
| Aug 10, 2023 | Boilers CLASS - 2 VENTING MATERIAL INSTALLED TO VENT HWH'S TO ROOF IS NOT UL LISTED AND LABELED FOR IT'S INTENDED USE/VENT TERMINATION IS NOT TO BUILT MANUFACTURES SPEC./COMBUSTION AIR OUTDOOR INTAKE IS MISSING BIRD SCREENS/DISC #39092253M | Oct 18, 2023 IN VIOLATION | $0 |
| Aug 7, 2023 | Construction CLASS - 1 SUMMONS ISSUED FOR FAILURE TO MAINTAIN DUE TO MULTIPLE CRACKS AND MISSING CONCRETE ON THE DECORATIVE SECTIONS OF THE PARAPET WALL AREA OF THE EXTERIOR WALL AT EXPOSURE #1 OF THE BUILDING., REPAIR AND/REPLACE #39092033K | Nov 12, 2024 IN VIOLATION | $1,250 |
| Oct 3, 2018 | Cranes and Derricks CLASS - 1 EXPIRED DISABILITY INSURANCE. AT TIME OF INSPECTION, I OBSERVED EXPIRED DISABILITY UPON RESEARCHING JOB PERMIT. DUE DILIGENCE SHOW THAT GENERAL CONTRACTOR DISABILITY INSURANCE EXPIRED ON 10/2/18. NOT CARRYING I #35363215H | Dec 24, 2018 DEFAULT | $12,500 |
| Oct 3, 2018 | Site Safety CLASS - 1 SUPERINTENDENT OR COMPETENT PERSON NOT PRESENT. AT TIME OF INSPECTION OF AN ALT-1, I OBSERVED ACTIVE CONSTRUCTION ACTIVITIES CONSISTING OF INTERIOR WORK(HVAC,PAINTING,ELECTRICAL,SANDING). UPON REQUESTING THE CO #35363216J | Dec 24, 2018 DEFAULT | $12,500 |
| Oct 3, 2018 | Site Safety CLASS - 1 INADEQUATE LOGS. AT TIME OF INSPECTION AT AN ALT-1 6 STORY BUILDING ACTIVE SITE. I OBSERVED THE SUPERINTENDENT LOG BOOK WAS LAST SIGNED ON 8/22/18 BY EMMANUEL KANARIS WHO IS NO LONGER THE SUPERINTENDENT ON SITE #35363217L | Dec 24, 2018 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Jun 23, 2024 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) #00902 | DOB VIOLATION - ACTIVE |
| Aug 8, 2023 | IMMEDIATE EMERGENCY INSTALL APPROXIMATELY 400 LINEAR FEET OF SIDEWALK SHED ALONG EXPOSURE #1 TO PROTECT THE PUBLIC AND PROPERTY #17798 | DOB VIOLATION - ACTIVE |
| Aug 7, 2023 | CONSTRUCTION DOB SUMMONS ISSUED FOR STRUCTURE RENDERED NON COMPLIANT DUE TO MULTIPLE CRACKS AND MISSING CONCRETE ON THE DECORATIVE SECTIONS OF THE PARAPET WALL AREA OF THE EXTERIOR WALL AT EXPOSURE #1 OF THE BUILDING #23-02311 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #13534 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #17574 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #33891 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #37687 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #34497 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #13307 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #39186 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #19140 | DOB VIOLATION - ACTIVE |
| Apr 22, 2023 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) #00206 | DOB VIOLATION - ACTIVE |
| Nov 21, 2022 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) #00026 | DOB VIOLATION - ACTIVE |
| Jun 20, 2021 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020) #00639 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 22, 2023 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Nov 21, 2022 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Jun 20, 2021 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 20, 2023 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL | Apr 26, 2023 |
| Apr 20, 2023 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL | Jul 24, 2023 |
| Apr 20, 2023 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT PUBLIC HALL | Jul 24, 2023 |
| Apr 20, 2023 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL | Jul 24, 2023 |
| Apr 20, 2023 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Jul 24, 2023 |
| Apr 20, 2023 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL | Jul 24, 2023 |
| Apr 20, 2023 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL | Jul 24, 2023 |
| Apr 20, 2023 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL | Jul 24, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 24, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR DOB VIO23-02311., COMPLY WITH COMMISSIONER'S ORDER; HIRE NYSPE TO SUBMIT REPORT TO EXECUTIVEINSPECTIONS@BUILDINGS.NYC.GOV WITHIN 30 DAYS, ADDRESSIN | Open |
| Aug 26, 2026 | ECB | Construction: WORK WITHOUT PERMIT, I OBSERVED 80% OF BATHROOM REMOVED IN APARTMENT 6B2, ALL WATER SUPPLY AND WASTE PIPING HAVE BEEN REMOVED FROM SHOWER AND SINK WITH NO PERMITS ON FILE IN THE DOB SYSTEM., OBTAIN ALL PERMITS | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 12:44 PM ET. BBL 3005157501.