Queens · Block 9770 · Lot 24 · 11432

160-26 Highland Avenue

2 floors · 14,400 sq ft · built 1986 · class M1 · owner of record: The Highland Church

2open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
May 5, 2020CONSTRUCTION
REQUEST ADDT'L INFORMATION. RESPONDENT IS REQUESTED TO PROVIDE A REVISED TR16 REPORT IN ACCORDANCE WITH 1RCNY 103-09 ALONG W/DETAILED CALS,DWGS,FOUNDATION DETAILS,SOIL TYPES ETC,IDENTIFYING THE FACTUAL BASIS(INCL. DATES PE PERSONALLY VISITED SITE)REMEDY:THE RESPONDENT SHOULD EXPLAIN THE ENG'R METHDO
#RW0802BH
DOB VIOLATION - ACTIVE
Oct 1, 2019RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#01049
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 8:55 AM ET. BBL 4097700024.

Look up another building