20 floors · 56 apartments · 125,800 sq ft · built 1960 · class D4 · owner of record: Walter & Samuels, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 63 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 115 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 125,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 307 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1369). Agency page | Dec 31, 2029 in 1159 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 10, 2026 | Cranes and Derricks CLASS - 2 AT THE TIME OF INSPECTION OF THE FACADE ALTERATION OF 20-STORY BUILDING. OBSERVED SUSPENDED SCAFFOLDS AND C-HOOK INSTALLED ON SUSPENDED SCAFFOLDS AT EXP # 1 AN 4, UPON CHECKING DOB WEBSITE NO NOTIFICATIONS REC #39559023N | Nov 19, 2026 PENDING | $2,500 |
| Sep 10, 2026 | Cranes and Derricks CLASS - 1 DURING INSPECTION OF THE 20-STORY FACADE ALTERATION, OBSERVED SUSPENDED SCAFFOLD PLATFORMS IN USE AT EXP?1 & 4. UPON REVIEW OF THEIR CD5 AND RELATED DOCUMENTS NO PRE AND POST INSTALLATION INSPECTION LETTER WAS #39559012H | Nov 19, 2026 | $10,000 |
| Sep 10, 2026 | Site Safety CLASS - 1 AT THE TIME OF INSPECTION OF THE FACADE ALTERATION OF 20-STORY BUILDING. OBSERVED C-HOOK AND PLATFORM, INSTALLED ON SUSPENDED SCAFFOLDS AT EXP # 1 UPON REQUEST OF PLATFORMS DRAWINGS AND C-HOOK MANUFACTURERS SPE #39559016P | Nov 19, 2026 | $2,500 |
| May 11, 2022 | Construction CLASS - 2 TEMP CONST EQUIPMENT ONSITE-EXPIRED PERMIT.ATO MY INSP OF APPROVED 20STY FACADE ALT@PREMISES 448E58THST&FILED@16SUTTONPL.I OBSERVED THERES SIDEWALK SHED IN PLACE@EXP1&4.SHED IN PLACE&WORK PERMIT M00482793-I1-SH #35648904M | Dec 8, 2022 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2100777 | DOB VIOLATION - ACTIVE |
| Jun 19, 2001 | ELEVATOR 1P24730 #38988 | DOB VIOLATION - ACTIVE |
| Jun 19, 2001 | ELEVATOR 1P24729 #38989 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 18, 2021 | B | Apt 7A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 23, 2021 |
| Aug 18, 2008 | B | D26-10.01, 10.05 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS 17 STY NORTH FIRE STAIRS. | Sep 22, 2008 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 10, 2026 | ECB | Cranes and Derricks: AT THE TIME OF INSPECTION OF THE FACADE ALTERATION OF 20-STORY BUILDING. OBSERVED SUSPENDED SCAFFOLDS AND C-HOOK INSTALLED ON SUSPENDED SCAFFOLDS AT EXP # 1 AN 4, UPON CHECKING DOB WEBSITE NO NOTIFICATIONS REC | Open |
| Sep 10, 2026 | ECB | Cranes and Derricks: DURING INSPECTION OF THE 20-STORY FACADE ALTERATION, OBSERVED SUSPENDED SCAFFOLD PLATFORMS IN USE AT EXP?1 & 4. UPON REVIEW OF THEIR CD5 AND RELATED DOCUMENTS NO PRE AND POST INSTALLATION INSPECTION LETTER WAS | Closed |
| Sep 10, 2026 | ECB | Site Safety: AT THE TIME OF INSPECTION OF THE FACADE ALTERATION OF 20-STORY BUILDING. OBSERVED C-HOOK AND PLATFORM, INSTALLED ON SUSPENDED SCAFFOLDS AT EXP # 1 UPON REQUEST OF PLATFORMS DRAWINGS AND C-HOOK MANUFACTURERS SPE | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 2:42 AM ET. BBL 1013690026.