Brooklyn · Block 8224 · Lot 39 · 11236

1597 Rockaway Parkway

2 floors · 1 apartments · 2,000 sq ft · built 1931 · class S1 · owner of record: Fsnr Acquisition Group Ii, Llc

9open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Annual boiler inspection (2 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-14 (Accepted). Agency page

Dec 31, 2026
in 47 days
1 of 2 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Required only if the owner doesn't live there
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 18 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Nov 28, 2017Boilers CLASS - 2
4B,5B,6A,11B/15,19B/21B,24B/32A,34B/50,50A/50B,50C/50D,50E/50F,50G-50)BOILER FLUE OUTSIDE BOILER ROOM TO CHIMNEY BASE IS NOT ENCLOSED. 50A)POOR FLAME FROM OIL BURNER (OIL ODOR). 50B)CHECK VALVE IS MISSING. 50E)
#32092299N
Mar 26, 2018
IN VIOLATION
$0
May 20, 1991Construction Non-Hazardous
WORK WITHOUT A PERMIT WORK NOTED HAVING PENITRATED FRONT WALL OF BUILDING AT WEST SIDE AND PLACING GLASS FRONT AND STUDS AND SHEET ROCK TO FORM ENCLOSURE AS NEWSSTAND AND CASHIER SERVICE REMEDY:OBTAIN APPROVALS
#34056842K
Dec 23, 1991
WRITTEN OFF
$0
May 13, 1991Construction Non-Hazardous
WORK WITHOUT A PERMIT WORK NOTED HAVING PLACED NEW DROP CEILING AT 1ST FLOOR STORE AREA NOTE WORK COMPLETED REMEDY OBTAIN APPROVALS AND PERMITS FOR ALL WORK PERFORMED
#34056837X
Dec 9, 1991
WRITTEN OFF
$0
DOB (4)
IssuedViolationStatus
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#15543
DOB VIOLATION - ACTIVE
Jun 1, 2001CONSTRUCTION
WORK WITHOUT A PERMIT. WORK NOTED: HAVING PENITRATED FRONT WALL OF BUILDING AT WEST SIDE & PLACING GLASS FRONT & STUDS WITH SHEET ROCK TO MAKE ENCLOSURE AS NEWSSTAND AND CASHIER SERVICE REMEDY: OBTAIN PERMITS
#18TC01
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Jun 1, 2001CONSTRUCTION
WORK WITHOUT PERMIT. WORK NOTED: HAVING PLACED NEW DROP CEILING AT 1ST FLOOR STORE AREA REMEDY: OBTAIN PERMIT
#18TC02
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Apr 15, 1999CONSTRUCTION
WORK WITHOUT A PERMIT. WORK NOTED: NEW DROP CEILING ERECTED AT STORE (1ST FL LEVEL) THROUGHOUT REMEDY: OBTAIN A PERMIT FOR DROP CEILING ERECTED OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
#18RR01
VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 2:10 PM ET. BBL 3082240039.

Look up another building