Bronx · Block 4971 · Lot 1 · 10466

1591 East 233 Street

2 floors · 35,539 sq ft · built 1948 · class HR · owner of record: Superior 233rd Llc

2open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
43dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2018-06-06 (Accepted). Agency page

Dec 31, 2026
in 43 days
1 of 1 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 35,539 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 164 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 164 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 408 days
Next cycle year 2027

Open violations

ECB / OATH (2) · $1,250 owed
IssuedViolationHearingBalance
Oct 6, 2026Construction CLASS - 2
AT THE TIME OF INSPECTION OBSERVED PVC BEING USED ON THE WATER HEATERS FRESH AIR INTAKE PIPING THIS IS CONTRARY TO 503.4.1, REPAIR AND/OR REPLACE
#39206971J
Dec 18, 2026
PENDING
$1,250
Oct 6, 2026Elevators CLASS - 1
CLASS 1 C/U: FIREFIGHTERS' SERVICE PHASE II - DOOR CLOSE FUNCTION INOPERATIVE, AS PER ASME A17.1 2.27.3.3.6. REMEDY: REPAIR DOOR CLOSE FUNCTION AND RESTORE PROPER PHASE II OPERATION. EMAIL ELEVATOR DIVISION AT
#39206912J
Dec 18, 2026
ADMIT/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 6, 2026ECBConstruction: AT THE TIME OF INSPECTION OBSERVED PVC BEING USED ON THE WATER HEATERS FRESH AIR INTAKE PIPING THIS IS CONTRARY TO 503.4.1, REPAIR AND/OR REPLACEOpen
Oct 6, 2026ECBElevators: CLASS 1 C/U: FIREFIGHTERS' SERVICE PHASE II - DOOR CLOSE FUNCTION INOPERATIVE, AS PER ASME A17.1 2.27.3.3.6. REMEDY: REPAIR DOOR CLOSE FUNCTION AND RESTORE PROPER PHASE II OPERATION. EMAIL ELEVATOR DIVISION ATOpen
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Closed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 7:37 AM ET. BBL 2049710001.

Look up another building