3 floors · 3 apartments · 2,736 sq ft · built 1899 · class C0 · owner of record: Dennis L Green
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 13, 2003 | CONSTRUCTION #NETZ04 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 4, 2006 | B | Apt 3F · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 13, 2006 |
| Aug 18, 2000 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILINGSTHRU-OUT IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY | Sep 27, 2000 |
| Aug 18, 2000 | B | Apt 3 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERIOR & EXTERIOR DOOR MOULDINGS AT SOUTH IN THE ENTRANCE LOCATED AT APT 3, 3rd STORY | Sep 27, 2000 |
| Aug 18, 2000 | A | Apt 3 · § 27-2005 ADM CODE REFIT DOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3, 3rd STORY | Nov 26, 2000 |
| Aug 18, 2000 | B | Apt 3 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR MOULDINGS IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3, 3rd STORY | Sep 27, 2000 |
| Aug 18, 2000 | A | Apt 3 · § 27-2005 ADM CODE REFIT WINDOW SASHES IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3, 3rd STORY | Nov 26, 2000 |
| Aug 18, 2000 | B | Apt 3 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS HOT & COLD WASHBASIN & BATHTUB IN THE BATHROOM LOCATED AT APT 3, 3rd STORY | Sep 27, 2000 |
| Aug 18, 2000 | B | Apt 3 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PEELING PAINT WASHBASIN & BATHTUB IN THE BATHROOM LOCATED AT APT 3, 3rd STORY | Sep 27, 2000 |
| Aug 18, 2000 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILINGS THRU-OUT IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY | Sep 27, 2000 |
| Aug 18, 2000 | B | Apt 3 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT PLASTER & CERAMIC TILE WALL UNDER WASHBASIN IN THE BATHROOM LOCATED AT APT 3, 3rd STORY | Sep 27, 2000 |
| Aug 18, 2000 | B | Apt 3 · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE SHOWER CURTAIN ROD IN THE BATHROOM LOCATED AT APT 3, 3rd STORY | Sep 27, 2000 |
| Aug 18, 2000 | A | Apt 3 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT 3, 3rd STORY | Nov 26, 2000 |
| Aug 18, 2000 | B | Apt 3 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR IN THE BATHROOM LOCATED AT APT 3, 3rd STORY | Sep 27, 2000 |
| Aug 18, 2000 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING BALUSTERS AT STAIR AT PUBLIC HALL, 2nd STORY | Sep 27, 2000 |
| Aug 18, 2000 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE BALUSTRADE AT STAIR AT PUBLIC HALL, 2nd STORY | Sep 27, 2000 |
| Aug 18, 2000 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS & CEILINGS 1ST TO 3RD STORIES AT PUBLIC HALL | Nov 26, 2000 |
| Aug 18, 2000 | B | Apt 3 · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE WASHBASIN IN THE BATHROOM LOCATED AT APT 3, 3rd STORY | Sep 27, 2000 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 11:49 PM ET. BBL 3018170084.