4 floors · 4 apartments · 3,600 sq ft · built 1900 · class C3 · owner of record: South Brooklyn Renewal Housing Developme Nt
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-06-10 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 29, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39095429K ISSUED ON 09/21/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT #37033071Z | Feb 23, 2026 IN VIOLATION | $1,250 |
| Sep 21, 2023 | Boilers CLASS - 2 IN BOILER ROOM THE HWH FLUE IS IN POOR CONDITION/IN GAS METER ROOM THE CEILING AS FALLEN DOWN;CORRECT VIOLATION AND SUBMIT THE CERTIFICATE OF CORRECTION #39095429K | Dec 6, 2023 STIPULATION/IN-VIO | $625 |
| Mar 25, 2022 | Unknown CLASS - 2 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT.NOTE AT THE TIME OF MY INSPECTION AT A 4 STORY BUILDING OBSERVED NO CONSTRUCTION ACTIVITIES.AFTER REVI #35646230X | Aug 10, 2022 DEFAULT | $6,250 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 6) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 9, 2024 | B | Apt 3A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 6 SQ FT AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16958380 ISSUED 09-MAY-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIV | Oct 14, 2024 |
| May 10, 2024 | B | Apt 3A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 14, 2024 |
| May 10, 2024 | B | Apt 3A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 14, 2024 |
| May 10, 2024 | B | Apt 3A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER TOP FORMICA IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 14, 2024 |
| May 10, 2024 | B | Apt 3A · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 14, 2024 |
| May 10, 2024 | C | Apt 3A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 24, 2024 |
| May 10, 2024 | B | Apt 3A · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 14, 2024 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 10:22 AM ET. BBL 3003190015.