3 floors · 50,000 sq ft · built 1965 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 50,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-16 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 17, 2026 | Construction CLASS - 2 REISSUED ECB#35691781P EXIT DOORS NOT SELF CLOSING.NOTED EXIT DOORS#3,#5,#8 NOT SELF CLOSING.REM:REPAIR/REPLACE DOOR. #35732222R | May 14, 2026 POP/IN-VIO | $0 |
| Apr 17, 2026 | Construction CLASS - 2 REISSUED ECB#35691782R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1;27-381.NOTED 2 EMERGENCY LIGHTS IN AUDITORIUM NOT WORKING.RE #35732221P | May 14, 2026 POP/IN-VIO | $0 |
| Apr 17, 2026 | Construction CLASS - 2 REISSUED ECB#35691779X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT 3RD FLOOR CEILINGS DAMAGE DUE TO WATER PENETRATION ROOMS#305,#326 AND CORRIDOR.REM:REPAIR AND/OR REPLACE. #35732223Z | May 14, 2026 POP/IN-VIO | $0 |
| Apr 10, 2025 | Construction CLASS - 2 REISSUE #35650863H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED 3RD FLOOR CEILINGS DAMAGED DUE TO WATER PENETRATION FROM ROOF. 3RD FLOOR STAIR C, 3RD FL RM #305, RM #326 AND CORRIDOR OUTSIDE OF #35691779X | Nov 7, 2025 POP/IN-VIO | $0 |
| Apr 10, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED EXTERIOR DOORS AT EXIT #3, 5 AND 8 NOT SELF-CLOSING PROPERLY DUE TO RUBBING ON SADDLES AS HAVING RUSTED AWAY HOLE. REMEDY: REPAIR/REPLACE DOOR. #35691781P | Nov 7, 2025 POP/IN-VIO | $0 |
| Apr 10, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED TWO EMERGENCY LIGHTS IN GYMNASIUM AND ONE IN CAFETERIA NOT WORKIN #35691782R | Nov 7, 2025 POP/IN-VIO | $0 |
| Apr 10, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED SCHOOLS ROOF WATERPROOF MEMBRANE HAS BECOME DEFECTIVE, ALLOWING WATER TO PENETRATE INSIDE. CREATING DAMAGE TO CEILINGS AT SEVERAL LOCATIONS ON THE 3R #35691780N | Nov 7, 2025 POP/IN-VIO | $0 |
| Apr 19, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER NOTED:OBSERVED AT(3RD FLOOR)STAIRCASE C,CLASSROOM#305 & #326.THE CEILINGS ARE IN STATEOF DISREPAIR DUE TO WATER PENETRATIONS COMING FROM THE ROOF AND CREATI #35650863H | Jul 26, 2022 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 14, 1990 | CONSTRUCTION MM #C10Q1 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 5:43 AM ET. BBL 4140090060.