1 floors · 7,440 sq ft · built 1900 · class P5 · owner of record: Calvary Church Of The Firstborn
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 64 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-23 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 18, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 39518260X, FILE A CERTIFICATE OF CORRECTION #39193062M | Aug 26, 2026 DEFAULT | $6,250 |
| Jun 26, 2023 | Construction CLASS - 1 FOUND 1 STORY BRICK GARAGE IN STATE OF DISREPAIR. MULTIPLE MISSING/BULGING BRICKS. EXP 4 WALL IS LEANING INWARDS AND IN DANGER OF COLLAPSE. #39518260X | Mar 22, 2024 IN VIOLATION | $0 |
| Aug 19, 2015 | Construction CLASS - 2 WORK W/O PERMIT. NOTE: PLYWOOD CONSTRUCTION FENCE ERECTED APPROX 25FT LONG X 10FT WIDE ON SIDEWALK. NO PERMIT OBTAIN FROM THIS DEPT. DUE TO DEFECTIVE 1 STY BRICK GARAGES W/LEANING PARAPET WALL. INSTRUCTION WAS #35149227H | Oct 5, 2015 STIPULATION/IN-VIO | $0 |
| Jul 24, 2015 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALL OR APPURTENANCES.NOTE 5 BRICK MASONRY 1 STORY GARAGES,DEFECTIVE & IN DANGER OF COLLAPSE.BRICK PARAPET WALLS CRACKED BROKEN W/ MISSING BRICKS,& PARAPET WALL LEANING INWARD IN DANGER #35116570Y | Dec 14, 2015 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 21, 2015 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00399 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #11251 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #11252 | DOB VIOLATION - ACTIVE |
| Sep 24, 2001 | CONSTRUCTION ECB #08CF04 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 21, 2015 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 10:52 AM ET. BBL 3013810001.