Bronx · Block 2919 · Lot 5 · 10457

1574 Bathgate Avenue

2 floors · 58,954 sq ft · built 1984 · class O5 · owner of record: Nyc Department Of Citywide Administrative Services

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
187dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 58,954 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 797 days
Next cycle year 2028
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2919). Agency page

Dec 31, 2029
in 1162 days
Next due 2029

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Jan 25, 2023Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).AT TIME OF INSPECTIONOBSERVED THROUGHOUT ENTIRE FACILITY ALL EXTERIOR & INTERIOR FIREPROOF
#35672190J
May 5, 2023
POP/IN-VIO
$0
DOB (2)
IssuedViolationStatus
Sep 10, 2020CONSTRUCTION
FTM. NOTED BY INSPECTOR: A SECTION OF FACADE OF APPROX 10X20 SQ FR HAVE DISLODGED AND FELL ONTO PUBLIC SIDEWALK ON EXP 2. REMEDY: THE OWNER ARE TO RETAIN A PROFESSIONAL ENGINEER TO EVALUATE ENTIRE BLDG AND PREPARE REPAIR DWG UNDER WORK PERMIT. THE REPAIR WORK SHALL START NO LATER THAN 10/10/2020. SI
#CEU20301KI
DOB VIOLATION - ACTIVE
Jul 2, 2020CONSTRUCTION
.A SECTION OF BRICK FACADE OF APPROIMATELY 10'X20' FEET AREA DISLODGED FALLING ONTO PUBLICK SIDEWALK AT EXP.#2 DUE TO TRUCK STRIKING UTILITY POLE CAUSING DAMAGE TO PREMISES FACADE
#CER01EP
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 8:30 AM ET. BBL 2029190005.