3 floors · 3 apartments · 4,350 sq ft · built 1906 · class C0 · owner of record: Saratoga Bk Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 46 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 16) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 2, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HYDRONIC BASEBOARD COVER AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Nov 8, 2026 |
| Jun 10, 2026 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 6, 2026 |
| Jun 10, 2026 | A | Apt 1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st BATHROOM FROM EAST, THE 2nd BATHROOM FROM EAST, THE 1st ROOM FROM EAST AT SOUTH, THE FOYER , THE 4th ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH, THE KITCHEN , | Sep 13, 2026 |
| May 16, 2025 | C | Apt 2 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APART | Jun 11, 2025 |
| Jan 13, 2022 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM .DOOR LOCKED AT CELLAR | Jan 19, 2022 |
| Mar 5, 2021 | A | § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING (100 WATTS REQUIRED) AT BUILDING FRONT | Jun 8, 2021 |
| Mar 3, 2021 | B | § 27-2050 ADM CODE PROVIDE AN ANGLE HOSE VALVE OR SILL COCK AT EXTREME END OF HIGHEST LINE OF SPRINKLERS. | Apr 7, 2021 |
| Mar 3, 2021 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF HASP AN EYE CAPABLE OF BEING PADLOCKED AT SCUTTLE HATCH COVER AT PUBLIC HALL, 3rd STORY | Mar 9, 2021 |
| Mar 1, 2021 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING A HASP AND EYE CAPABLE OF BEING LOCKED AT THE GATE AT THE BUILDING FRONT YARD | Mar 7, 2021 |
| Date | Source | What | Now |
|---|---|---|---|
| Nov 2, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HYDRONIC BASEBOARD COVER AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 3:30 AM ET. BBL 3015150003.