30 apartments · 31,776 sq ft · built 2022 · class D7 · owner of record: 1562 Dekalb Construction Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 50 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 31,776 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 1, 2026 | Construction CLASS - 2 UPON INSPECTION, OBSERVED CONSTRUCTION FENCE SURROUNDING THE JOBSITE PERIMETER NOT MAINTAINED IN ACCORDANCE WITH BC 3307.7. FENCE PANELS ARE IN POOR CONDITION, COVERED WITH GRAFFITI AND ADVERTISING POSTERS UNRE #39549772L | Apr 8, 2026 DEFAULT | $2,500 |
| Nov 13, 2025 | Construction CLASS - 2 JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION. AT THE TIME OF INSPECTION, I OBSERVED A CONSTRUCTION SITE FENCE UNDER JOB # B00503816-I1-FN COVERED IN POSTERS AND MISSING ACRYLIC MATERIAL O #39166869J | Jan 21, 2026 DEFAULT | $2,500 |
| May 16, 2025 | Construction CLASS - 2 OBSERVED A CONSTRUCTION FENCE INSTALLED AROUND A VACANT LOT. FENCE CONDITIONS NOT AS PER CODE. PAINTED OVER NAIL/SCREWS PROTRUDING OUT OF FENCE. VIEWING PANELS NOT MAINTAINED OR MISSING B.C 3307.7.3 . FENCE POS #39540310X | Jul 23, 2025 DEFAULT | $2,500 |
| Sep 12, 2019 | Unknown CLASS - 1 FAILURE TO PROVIDE OSHA TRAINING. AT THE TIME OF MY INSPECTION ON AN ACTIVE JOBSITE OF A 1 STY BLDG. PERMIT HOLDER FAILED TO ENSURE EACH WORKER SUCCESSFULLY COMPLETED THE REQUIRED TRAINING UNDER BC3321.1,I OBSE #35448193Z | Mar 1, 2021 IN VIOLATION | $1,250 |
| Sep 12, 2019 | Construction CLASS - 1 FAILURE TO PROVIDE SIDEWALK SHED WERE REQUIRED/OHP. AT THE TIME OF MY INSPECTION ON AN ACTIVE JOBSITE OF A 1 STY BLDG UNDER FULL DEMOLITION. I OBSERVED WORKERS ON SITE ENCAGED IN DEMO OPERATIONS. AS I REVIEWED #35448187M | Mar 1, 2021 IN VIOLATION | $2,500 |
| Sep 12, 2019 | Unknown CLASS - 1 FAILURE TO PROVIDE OSHA TRAINING. AT THE TIME OF MY INSPECTION ON AN ACTIVE JOBSITE OF A 1 STY BLDG. PERMIT HOLDER FAILED TO ENSUTE EACH WORKER SUCCESSFULLY COMPLETED THE REQUIRED TRAINING UNDER BC3321.1,I OBSE #35448195M | Mar 1, 2021 IN VIOLATION | $1,250 |
| Sep 12, 2019 | Unknown CLASS - 2 SCAFFOLD TRAINING CERTIFICATE CARD NOT READILY AVAILABLE FOR INSPECTION. AT THE TIME OF MY INSPECTION ON AN ACTIVE JOBSITE OF A 1 STY BLDG UNDER FULL DEMOLITION. I OBSERVED WORKERS ON A SUPPORTED SCAFFOLD WORKI #35448198H | Mar 1, 2021 IN VIOLATION | $625 |
| Sep 12, 2019 | Unknown CLASS - 1 FAILURE TO PROVIDE OSHA TRAINING. AT THE TIME OF MY INSPECTION ON AN ACTIVE JOBSITE OF A 4 STY BLDG PERMIT HOLFDER FAILED TO ENSURE EACH WORKER SUCCESSFULLY COMPLETED THE REQUIRED TRAINING UNDER BC3321.1,I OBSE #35448191P | Mar 1, 2021 IN VIOLATION | $1,250 |
| Sep 12, 2019 | Construction CLASS - 1 FAILURE TO INSTITUTE & MAINTAIN SAFE CONSTRUCTION OPERATIONS.(MAKE SHIFT LADDER)AT THE TIME OF MY INSPECTION ON AN ACTIVE JOBSITE OF A 1 STYBLDG., I OBSERVED ON SITE AT EXP#2 A MAKESHIFT LADDER CONSTRUCTED OF #35448189X | Mar 1, 2021 IN VIOLATION | $1,250 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 6:54 PM ET. BBL 3032480012.