6 floors · 66 apartments · 71,000 sq ft · built 1940 · class D1 · owner of record: East 13 Assets Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 71,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 409 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6760). Agency page | Dec 31, 2030 in 1505 days | Next due 2030 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-08 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 23, 2024 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) #00330 | DOB VIOLATION - ACTIVE |
| Apr 22, 2023 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) #00856 | DOB VIOLATION - ACTIVE |
| Feb 3, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00020 | DOB VIOLATION - ACTIVE |
| Nov 3, 2022 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00031 | DOB VIOLATION - ACTIVE |
| Aug 3, 2022 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00072 | DOB VIOLATION - ACTIVE |
| Jun 2, 2022 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00204 | DOB VIOLATION - ACTIVE |
| Oct 10, 2021 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020 #10030 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Apr 22, 2023 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Feb 3, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 3, 2022 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 3, 2022 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jun 2, 2022 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Oct 10, 2021 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 9, 2026 | A | Apt D10 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT OBSERVED AT WEST WALL IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jan 12, 2027 |
| Sep 30, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND IT'S ASSEMBLY AT COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 3rd STORY | Nov 4, 2026 |
| Sep 30, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND IT'S ASSEMBLY AT COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 2nd STORY | Nov 4, 2026 |
| Sep 24, 2026 | B | Apt D10 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AT AROUND THE BATHTUB IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 29, 2026 |
| Sep 24, 2026 | B | Apt D10 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LOCK AND ASSEMBLY IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 29, 2026 |
| Sep 1, 2026 | A | Apt D10 · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT GROUT JOINTS OF THE CERAMIC TILES AT WEST, NORTH AND EAST WALLS AROUND BATHTUB, IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 5, 2026 |
| Aug 24, 2026 | A | Apt APTD10 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT NORTH WALL IN THE BATHROOM LOCATED AT APT APTD10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 27, 2026 |
| Aug 24, 2026 | A | Apt APTD10 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILE AT NORTH WALL IN THE BATHROOM LOCATED AT APT APTD10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 27, 2026 |
| Apr 29, 2024 | B | Apt E5 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT E5, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 3, 2024 |
| Apr 29, 2024 | B | Apt E5 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT E5, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 3, 2024 |
| Apr 29, 2024 | B | Apt E5 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT E5, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 3, 2024 |
| Apr 29, 2024 | B | Apt E5 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT E5, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 3, 2024 |
| Jul 1, 2020 | A | Apt D8 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT D8, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 4, 2020 |
| Jul 1, 2020 | B | Apt D8 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE BATHROOM LOCATED AT APT D8, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 5, 2020 |
| Jul 1, 2020 | A | Apt D8 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGROUTE WALL TILE IN THE BATHROOM LOCATED AT APT D8, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 4, 2020 |
| Jul 1, 2020 | A | Apt D8 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES IN THE BATHROOM LOCATED AT APT D8, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 4, 2020 |
| Jul 1, 2020 | A | Apt D8 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT SWITCH IN THE BATHROOM LOCATED AT APT D8, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 4, 2020 |
| Jul 1, 2020 | B | Apt D8 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT D8, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 5, 2020 |
| Jul 1, 2020 | B | Apt D8 · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT D8, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Aug 5, 2020 |
| Jul 1, 2020 | A | Apt D8 · § 27-2005 ADM CODE REFIT WINDOW IN THE KITCHEN LOCATED AT APT D8, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 4, 2020 |
| Mar 4, 2010 | B | Apt D8 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... CEILING 5 S,Q FT IN THE BATHROOM LOCATED AT APT D8, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Apr 8, 2010 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 9, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT OBSERVED AT WEST WALL IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Sep 30, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND IT'S ASSEMBLY AT COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 3rd STORY | Open |
| Sep 30, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND IT'S ASSEMBLY AT COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 2nd STORY | Open |
| Sep 30, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 2nd STORY | Closed |
| Sep 30, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 3rd STORY | Closed |
| Sep 24, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AT AROUND THE BATHTUB IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Sep 24, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LOCK AND ASSEMBLY IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Sep 1, 2026 | HPD A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT GROUT JOINTS OF THE CERAMIC TILES AT WEST, NORTH AND EAST WALLS AROUND BATHTUB, IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Sep 1, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT THE ENTRANCE DOOR TO COMPACTOR CLOSET, AT PUBLIC HALL, 1st STORY | Closed |
| Sep 1, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT THE ENTRANCE DOOR TO COMPACTOR CLOSET , AT PUBLIC HALL, 4th STORY | Closed |
| Sep 1, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST , NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed |
| Sep 1, 2026 | HPD C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL , IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed |
| Sep 1, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET,OBSERVED AT WEST, NORTH, EAST WALLS AND WINDOW FRAME IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed |
| Sep 1, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD WASHBASIN CABINET IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed |
| Sep 1, 2026 | HPD A | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION METAL LAUNDRY CABINET AT WEST WALL IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed |
| Sep 1, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUTS JOINTS, CERAMIC TILES AT RECESSED WALLS AND WINDOW SILL 1ST FROM WEST AT NORTH, IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed |
| Aug 24, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT NORTH WALL IN THE BATHROOM LOCATED AT APT APTD10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Aug 24, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILE AT NORTH WALL IN THE BATHROOM LOCATED AT APT APTD10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Aug 11, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGROUT THE MORTAR JOINTS AT CERAMIC TILES NORTH WINDOW SILL IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Closed |
| Aug 11, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET UNDERNEATH THE, WASH BASIN ,EAST WALL , IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Closed |
| Aug 11, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED AND MISSING , CERAMIC TILES ,AT NORTH WALL, IN THE BATHROOM LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Closed |
| Aug 11, 2026 | HPD C | § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR AT EAST IN THE 3rd ROOM FROM EAST LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 9:33 PM ET. BBL 3067600062.