12 floors · 34 apartments · 76,302 sq ft · built 1916 · class D3 · owner of record: Harmil Realty Llc C/O
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1216). Agency page | Dec 31, 2026 in 47 days | Due this year |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $57,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 99 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 76,302 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-27 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 27, 2019 | Unknown CLASS - 2 FAILURE TO POST SAFE CONSTRUCTION BILL OF RIGHTS, POST OR DISTRIBUTE SAFE CONSTRUCTION BILL OF RIGHTS; COMPLY WITH NOTICE OF VIOLATION #39004749N | Sep 19, 2019 DEFAULT | $6,250 |
| Jun 27, 2019 | Unknown CLASS - 2 FAILURE TO POST OR DISTRIBUTE TENANT PROTECTION PLAN, POST OR DISTRIBUTE NOTICE OF TPP; COMPLY WITH NOTICE OF VIOLATION #39004750K | Sep 19, 2019 DEFAULT | $6,250 |
| Jan 29, 2008 | Elevators Non-Hazardous CEASE USE.40T07,38O02,84V10,05B01,86BB05.40T-PROVIDE LABEL ON OVERHEADDOOR.38O-CLEAN TOP OF CAR.84V-CAR NOT LEVEL ON ALL FLOORS REPAIR.05B-ADJUST CAR DOOR C USE ITEM WHEN CAR DOOR CLOSE YOU CAN PUT FINGERS THRO #38181171R | Mar 20, 2008 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #01337 | DOB VIOLATION - ACTIVE |
| Feb 21, 2018 | FACADE SAFETY PROGRAM #HAZ87286 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #02489 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #00150 | DOB VIOLATION - ACTIVE |
| Oct 24, 2001 | ELEVATOR 1P9711 #9011/41326 | DOB VIOLATION - ACTIVE |
| Oct 24, 2001 | ELEVATOR 1P9712 #9011/41327 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Feb 21, 2018 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 5, 2025 | B | Apt 8A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 8A, 8th STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 10, 2025 |
| Sep 5, 2025 | B | Apt A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 10, 2025 |
| Sep 5, 2025 | B | Apt C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 10, 2025 |
| Sep 5, 2025 | B | Apt 11B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 11B, 11th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 10, 2025 |
| Sep 5, 2025 | B | Apt 11C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 10, 2025 |
| Sep 5, 2025 | B | Apt 10B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 10B, 10th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 10, 2025 |
| Sep 5, 2025 | B | Apt 8B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 8B, 8th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 10, 2025 |
| Jul 31, 2025 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Aug 4, 2025 |
| Jul 31, 2025 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Aug 4, 2025 |
| Jun 10, 2025 | C | Apt 6A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 24, 2025 |
| Jan 23, 2025 | C | Apt 6A · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Feb 16, 2025 |
| Jan 22, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM NORTH AT EAS | Mar 1, 2025 |
| Jan 22, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT A | Mar 1, 2025 |
| Jan 22, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd PRIVATE HALLWAY FROM NORTH LOCATED A | Mar 1, 2025 |
| Jan 22, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT | Mar 1, 2025 |
| Jan 22, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE FOYER LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 27, 2025 |
| Jan 22, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st DOOR FROM SOUTH AT WEST WALL IN THE 2nd PRIVATE HALLWAY FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 27, 2025 |
| Jan 22, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 27, 2025 |
| Jan 22, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st DOOR FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM NORTH AT CENTER LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 27, 2025 |
| Jan 22, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st PRIVATE HALLWAY FROM NORTH, THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 27, 2025 |
| Jan 22, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL, NORTH WALL IN THE FOYER LOCATED AT APT 6A, 6th STORY, 1st APA | Mar 1, 2025 |
| Jan 22, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, 1st DOOR FRAME FROM SOUTH AT WEST WALL | Mar 1, 2025 |
| Jun 26, 2023 | B | Apt 2C · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN SINK WASTELINE IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 31, 2023 |
| Feb 8, 2022 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | May 14, 2022 |
| Feb 9, 2015 | C | Apt 2C · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 17, 2015 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 3:19 PM ET. BBL 1012160054.