2 floors · 14,203 sq ft · built 1913 · class K2 · owner of record: Cyckman Crestview Realty,
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-04 (Accepted). Agency page | Dec 31, 2026 in 59 days | 2 of 3 without an accepted 2026 report yet |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 424 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 16, 2025 | Unknown CLASS - 1 ATOI OBSERVED SPLIT A/C UNIT INSTALLED & WIRED WITH CONNECTION TO AN ELECTRICAL DISCONNECT BOX TO SUPPLY POWER TO A/C UNIT ATTACHED APPROXIMATELY 9 FT. ABOVE GRADE TO BUILDING'S FACADE AT EXPOSURE #2. SEARCH OF #39135688Z | Apr 20, 2027 DEFAULT | $4,000 |
| Oct 22, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35373331Y ISSUED ON 3/8/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REMEDY:COMPLY W/ COMMISSION #35511838X | Apr 30, 2020 IN VIOLATION | $1,250 |
| Mar 8, 2019 | Construction CLASS - 1 MISCELLANEOUS VIOLATION ON 03-08-19 @ APPROX 11AM I OBSERVED ON THE 1ST FLOOR AN ACTIVE BUSINESS ESTABLISHMENT "CASTRO" OPERATING WITHOUT AN UPDATED FDNY ANSUL APPROVED LETTER AS PER THE FUEL GAS CODE 406.6.4.1 #39001540Z | Sep 5, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 27, 2018 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER FOR JOB# 1230797 92 DUE TO REVOCATION OF APPROVALS/PERMITS. STOP ALL WORK IMMEDIATELY, MAKE SITE SAFE, PROVIDE REQUIRED INFORMATION TO BOROUGH COMMISSIONER'S OFFICE FORTHWITH #1201KB | DOB VIOLATION - ACTIVE |
| Nov 12, 2017 | CONSTRUCTION DUE TO FIRE #CNE04MR | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 8:41 PM ET. BBL 1021740066.