14 floors · 60 apartments · 103,835 sq ft · built 1917 · class D4 · owner of record: 156 E 79 St Cp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 44 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 103,835 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $15,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 827 days | Filing window not open yet |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1413). Agency page | Dec 31, 2033 in 2601 days | Next due 2033 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-10 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 10, 2021 | Construction CLASS - 1 BC 3314.3.3 DRAWINGS-NO DETAIL DRAWINGS FOR SUPPORTED SCAFFOLD AT SITEFACADE REPAIR.UPON WALKING AROUND THE BUILDING I SAW SUPPORTED SCAFFOLD AT EXP#4.WHEN ASKED FOR THE DETAIL DRAWINGS NON WAS MADE AVAILABLE A #35587604Y | Oct 23, 2026 | $6,250 |
| Apr 26, 2006 | Elevators Non-Hazardous 66O02/71D02/59Q03/38O02/67O02/68O02/36O02/39O02/55O02/21B07/54#12/84M07. 66- CLEAN PIT. 71- CLEAN UNDER CAR 59- MOTOR RM LIGHTS UNGUARDED 38- CLEAN CAR TOP 67- CLEAN CAR RAILS 68- CLEAN COUNTERWEIGHT RAILS 36- #38158240X | Jun 15, 2006 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2001058 | DOB VIOLATION - ACTIVE |
| Feb 21, 2019 | FACADE SAFETY PROGRAM #HAZ87933 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #01302 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Feb 21, 2019 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 29, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 2, 2026 |
| Jun 4, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 7, 2025 |
| Apr 1, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 5, 2024 |
| Jun 1, 2010 | B | Apt 14C · SECTION 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 14C, 14th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 6, 2010 |
| May 28, 2008 | A | D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS 14 STY REAR WEST APT 14C ENTIRE APT. | Aug 31, 2008 |
| May 28, 2008 | B | SECTION 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION 4 STY SOUTH WEST APT F FORMER CLASS A APT ALTERED TO 2 CLASS A APTS. | Jul 2, 2008 |
| May 28, 2008 | A | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING SOUTH EAST ROOM 14 STY APT 14C SOUTH WEST APT. | Aug 31, 2008 |
| May 28, 2008 | A | SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION OPENING CUT THRU REAR SOUTH WALL AIR CONDITIONERS INSTALLED 3RD 5TH 6TH 8TH 9TH 10TH & 12TH STY | Aug 31, 2008 |
| May 28, 2008 | B | D26-10.01 ADM CODE FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING TOP GUIDE STOP SOUTH WEST FIRE ESCAPE. | Jul 2, 2008 |
| May 28, 2008 | A | SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ALUMINIUM EXTENSION BUILT ON ROOF AT CENTER. | Aug 31, 2008 |
| Jul 28, 2006 | A | Apt 14C · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE CEILING OF HEAT RISER WEST BATHROOM 14 STY EAST SECTION SOUTH APT 14C. , SECTION '' '' | Nov 12, 2006 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 8:04 AM ET. BBL 1014130050.