5 floors · 9 apartments · 5,465 sq ft · built 2022 · class C1 · owner of record: 1554-1556 Ny Ave Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 49 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 49 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 65 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 293 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 414 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 1, 2022 | Construction CLASS - 2 OBSERVED MACHINERY STORED IN ROADWAY WITH NO DOT PERMIT AND NO WORK STORAGE ZONE IN PLACE AS REQUIRED BY BC 3307.4.7. ALSO OBSERVED MISSING WIRE MESH TO ENCLOSE GAP BETWEEN FENCE AND SWS AS REQUIRED BY BC 3307. #39067123J | Aug 28, 2023 IN VIOLATION | $625 |
| Dec 20, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT. NOTE:AT THE TIME OF MY INSPECTION OF A DEMO CONSTRUCTION W/ LARGE AMOUNT OF CONST DEBRIS ON SITE. UPON REVIEW AREA THERE ARE CONDITION WHEN FIR #35504975R | May 4, 2022 IN VIOLATION | $625 |
| Dec 15, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING FOR CONSTRUCTION CODE.NOTE:AT TIME OF INSPECTION OF 3 STORY FULL DEMOLITION SITE ENTIRE BUILDING RAZED AND LEFT ON SITE CREATING HAZARDOUS LARGE AMOUNTS OF COMBUSTIBLE #35639627Z | Apr 27, 2022 IN VIOLATION | $625 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 12, 2026, 3:46 AM ET. BBL 3050070068.