Brooklyn · Block 29 · Lot 16 · 11201

155 Water Street

6 floors · 30,020 sq ft · built 2000 · class O5 · owner of record: 155 Water St Associates

12open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
184dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 30,020 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1159 days
Next cycle year 2029

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Aug 25, 2004Construction Non-Hazardous
WORK WITHOUT A PERMIT. WORK NOTED: CHIMNEY BEING DEMOLITED WORKER REMOVING BRICK FROM CHIMNEY AT ROOF LEVEL NO PERMIT POSTED AT TIME OF INSPREMEDY: STOP ALL WORK!! OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDIT
#34450457J
Feb 28, 2005
IN VIOLATION
$0
DOB (10)
IssuedViolationStatus
Sep 26, 2022CONSTRUCTION
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. BLDG HAS A DEFECTIVE MASONRY FACADE. AS NOW IN PROVIOUS VIOLATION ISSUED ON 5/12/22 WHICH INCLUDE DAMAGED PARAPET WALLS, DAMAGED MASONRY ON CHIMNEY, DAMAGED WINDOW SILLS THROUGHOUT. REMEDY: COMPLY WITH CODE
#LL0203JC
DOB VIOLATION - ACTIVE
Dec 10, 2021CONSTRUCTION
EMERGENCY WORK ORDER DUE TO UNSTABLE CHIMNEY LOCATED AT EXP 1 NORTHEAST CORNER. REMEDY: IMMED PROVIDE SAFETY MEASURES FROM UNSTABLE CHIMNEY AND DEFECTIVE BRICKWORK AT ALL EXPOSURES UNDER NYS LIC PROF ENG'R DIRECTION. ALSO RETAIN ENG'R TO PROVIDE A PLAN FOR REPAIRS TO BE MADE TO THE FACADE AND CHIMNE
#LLFA01LJN
DOB VIOLATION - ACTIVE
Dec 10, 2021CONSTRUCTION
EMERGENCY WORK ORDER DUE TO UNSTABLE CHIMNEY LOCATED AT EXP 1, NORTH EAST CORNER. REMEDY: IMMED PROVIDE SAFETY MEASURES FROM UNSTABLE CHIMNEY AND DEFECTIVE BRICKWORK AT ALL EXPOSURES UNDER NYS LIC PROF ENGINEER'S DIRECTION. ALSO RETAIN ENGINEER TO PROVIDE A PLAN FOR REPAIRS TO BE MADE TO THE FACADES
#LLFA01LJ
DOB VIOLATION - ACTIVE
Dec 1, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2102057
DOB VIOLATION - ACTIVE
Apr 23, 2019CONSTRUCTION
FTM BUILDING EXTERIOR WALLS/FACADES AND APPURTANCES.EXP#1 WEST ELEV: STEP CRACK AT GROUND LEVE. EXP#3,EAST ELEVATION:WOOD WINDOW SILL CRACKED,HANGING FLASHING OVER SILL.EXP#4 SOUTH ELEVATION:SPALLING WINDOW SILLS ERODED MORTAR JOINTS.ROOF:SPALLED AND MISSING COPING REMEDY:MAINTAIN BLDG EXTERIOR WALL
#LL0208PR
DOB VIOLATION - ACTIVE
Apr 23, 2019CONSTRUCTION
FTM BUILDING EXTERIOR WALLS/FACADES AND APPURTENANCES. EXP#1 WEST ELEVATION:STEP CRACK AT GROUND LEVEL.EXP#3 EAST ELEVATION:WOOD WINDOW SILL CRACKED,HANGING FLASHING OVER SILL.EXP#4 SOUTH ELEVATION:SPALLING WINDOW SILLS ERODED MORTAR JOINTS. ROOF: SPALLED AND MISSING COPING REMEDY:MAINTAIN BLDG EXTE
#LL0207PR
DOB VIOLATION - ACTIVE
May 1, 2001CONSTRUCTION

#02EC05
DOB VIOLATION - ACTIVE
May 1, 2001CONSTRUCTION
WORK WITHOUT A PERMIT. WORK NOTED: IN CELLAR A SHOWER & TOILET WAS INSTALLED ON A LOFT TYPE STRUCTURE & DEPT OF BLDGS RECORDS INDICATES NO PERMITS WERE ISSUED REMEDY: OBTAIN PERMIT, OR RESTORE TO PRIOR LEGAL CONDITION
#02EC02
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#02390
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#18947
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Dec 1, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 6:31 AM ET. BBL 3000290016.

Look up another building