1 floors · 8,000 sq ft · built 1862 · class M1 · owner of record: Grace Episcopal Church
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-03 (Accepted). Agency page | Dec 31, 2026 in 44 days | 1 of 3 without an accepted 2026 report yet |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 409 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 11, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING.OBSERVED ACCORDING TO DOB RECORDS NO CERTIFICATE OF CORRECTION ON FILE IN CONJUNCTION WITH ECB VIO #35376161Y | Mar 19, 2019 DEFAULT | $0 |
| Mar 20, 2018 | Construction CLASS - 2 FAILURE TO FILE THE CERT OF CORRECTION FOR ECB #35251037H,35292322H,32076720H & 32076719K W/DOB.REM:FILE CERT OF CORRECTION. #35319743N | May 8, 2018 DEFAULT | $0 |
| Oct 26, 2017 | Construction CLASS - 2 FAILURE TO COMPLY W/COMM'S ORDER TO CERTIFY CORRECTION. FAILURE TO CERTIFY CORRECTION OF ECB#35251037H. REMEDY: FILE C OF C. #35292322H | Mar 6, 2018 IN VIOLATION | $0 |
| May 8, 2017 | Construction CLASS - 2 WORK W/O PERMIT. AT TIME OF INSPECTION IN BOILER ROOM I OBSERVED NEW HOT WATER HEATER. GAS PIPING,WATER PIPING EXISTING NO PERMIT ON DOB RECORD TO PERFORM THIS JOB. REMEDY: OBTAIN ALL REQUIRED PERMITS. #35251037H | Jun 27, 2017 DEFAULT | $0 |
| Aug 19, 2016 | Boilers CLASS - 2 B254,15,16,32A,34A,38,50A,50B,50C,50D,50E,50F. 50A-CHECK VALVE MISS ING; 50B-INSULATE PIPES; 50C-WRONG GAUGE FLUE PIPE; 50D-MISSING CLEAN OUT; 50E- NO BAND IRON; 50F-GAS METER IN BOILER ROOM WILLIAMSON BOILER #32076720H | Oct 4, 2016 STIPULATION/IN-VIO | $0 |
| Aug 19, 2016 | Boilers CLASS - 2 B254,15,16,32A,36,38,50A,50B,50C,50D,50E. 50A-WRONG FLUE PIPE; 50B- INSULATE PIPES; 50C-MISSING MANUAL RESET LOW WATER CUTOFF; 50C-CHECK VALUE MISSING; 50D-MISSING CLEAN OUT AT BASE OF CHIMNEY; 50E-SECURE #32076719K | Oct 4, 2016 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #17928 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #15166 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 4:11 PM ET. BBL 4097540011.