Queens · Block 9754 · Lot 11 · 11432

155-19 Jamaica Avenue

1 floors · 8,000 sq ft · built 1862 · class M1 · owner of record: Grace Episcopal Church

18open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Annual boiler inspection (3 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-03 (Accepted). Agency page

Dec 31, 2026
in 44 days
1 of 3 without an accepted 2026 report yet
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 409 days
Next cycle year 2027

Open violations

ECB / OATH (6)
IssuedViolationHearingBalance
Jan 11, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING.OBSERVED ACCORDING TO DOB RECORDS NO CERTIFICATE OF CORRECTION ON FILE IN CONJUNCTION WITH ECB VIO
#35376161Y
Mar 19, 2019
DEFAULT
$0
Mar 20, 2018Construction CLASS - 2
FAILURE TO FILE THE CERT OF CORRECTION FOR ECB #35251037H,35292322H,32076720H & 32076719K W/DOB.REM:FILE CERT OF CORRECTION.
#35319743N
May 8, 2018
DEFAULT
$0
Oct 26, 2017Construction CLASS - 2
FAILURE TO COMPLY W/COMM'S ORDER TO CERTIFY CORRECTION. FAILURE TO CERTIFY CORRECTION OF ECB#35251037H. REMEDY: FILE C OF C.
#35292322H
Mar 6, 2018
IN VIOLATION
$0
May 8, 2017Construction CLASS - 2
WORK W/O PERMIT. AT TIME OF INSPECTION IN BOILER ROOM I OBSERVED NEW HOT WATER HEATER. GAS PIPING,WATER PIPING EXISTING NO PERMIT ON DOB RECORD TO PERFORM THIS JOB. REMEDY: OBTAIN ALL REQUIRED PERMITS.
#35251037H
Jun 27, 2017
DEFAULT
$0
Aug 19, 2016Boilers CLASS - 2
B254,15,16,32A,34A,38,50A,50B,50C,50D,50E,50F. 50A-CHECK VALVE MISS ING; 50B-INSULATE PIPES; 50C-WRONG GAUGE FLUE PIPE; 50D-MISSING CLEAN OUT; 50E- NO BAND IRON; 50F-GAS METER IN BOILER ROOM WILLIAMSON BOILER
#32076720H
Oct 4, 2016
STIPULATION/IN-VIO
$0
Aug 19, 2016Boilers CLASS - 2
B254,15,16,32A,36,38,50A,50B,50C,50D,50E. 50A-WRONG FLUE PIPE; 50B- INSULATE PIPES; 50C-MISSING MANUAL RESET LOW WATER CUTOFF; 50C-CHECK VALUE MISSING; 50D-MISSING CLEAN OUT AT BASE OF CHIMNEY; 50E-SECURE
#32076719K
Oct 4, 2016
STIPULATION/IN-VIO
$0
DOB (2)
IssuedViolationStatus
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#17928
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#15166
DOB VIOLATION - ACTIVE
DOB NOW Safety (10)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Mar 26, 2002Boiler LL6291
Active
Feb 27, 2001Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Mar 16, 1999Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 4:11 PM ET. BBL 4097540011.

Look up another building