Queens · Block 5328 · Lot 15 · 11355

155-17 Sanford Avenue

6 floors · 36 apartments · 30,340 sq ft · built 1928 · class D4 · owner of record: 155-17 Sanford Owners

34open violations
$11,150ECB/OATH penalties owed
1HPD class C (immediately hazardous)
44dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 30,340 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-03 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (6) · $11,150 owed
IssuedViolationHearingBalance
Sep 16, 2026Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. DOB VIO 030426PI40702TC AND DOB CONTROL #348100. DATED 03/04/2026. NO COMPLIANCE ON FILE FOR ANNUAL PARAPET OBSERVATION REPORT. REMEDY: COMPLY WITH THE COMMISSIO
#35733233R
Dec 1, 2026
PENDING
$2,500
May 20, 2026Construction CLASS - 1
UNLAWFUL ACTS: FAILURE TO COMPLY W/ COMMISSIONER'S ORDER. THE RESPONDENT FAILED TO COMPLY WITH OUR SECOND DOB NOTICE OF VIOLATION ISSUED ON 04-17-26 AT 1059 AM, AS STATED WITHIN CONTROL #348493/VIOLATION #04062
#35718751L
Mar 23, 2027
PENDING
$2,500
Mar 4, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.BUILDING IS A 6 STORY M.D. ON CORNER LOT,BUILDING HAS BRICK FACADE OBSERVED SEVERAL CRACKS AT PARAPET LEVEL.CRACKS AT EXP 1/4 CORNER,CRACKS AT 3/4 CORNER
#35718820X
May 12, 2026
IN VIOLATION
$1,250
Nov 27, 2024Construction CLASS - 2
BC 3301.9.2.6 FAIL TO MAINTAIN SIDEWALK SHED PARAPET INFORMATION PANEL.@6STORY OCCUPIED BUILDING OBSERVE PERMITTED SIDEWALK SHED IN PLACE&SHEDS PARAPET INFORMATION PANEL NOT LEGIBLE, NOT SECURELY ATTACHED+SUSCE
#39534747H
Apr 8, 2025
IN VIOLATION
$1,250
Nov 27, 2024Construction CLASS - 2
BC3307.6 SIDEWALK SHED.@6STORY OCCUPIED BUILDING OBSERVE PERMITTED PEDESTRIAN PROTECTION SIDEWALK SHED IN PLACE WITH SHEDS NET TIED AROUND VERTICAL MEMBER OBSTRUCTING BUILDING DOOR TO ACCESS SIDEWALK @EXPOSURE#
#39534746X
Apr 8, 2025
IN VIOLATION
$2,400
Mar 15, 2024Construction CLASS - 2
UPON INSPECTION, PREMISES HAS SIDEWALK SHED ERECTED AT EXPOSURES # 1&4 WITH MISSING INFORMATION PANEL ON ALL STREET FRONTAGES AS REQUIRED BY CODE(3301.9.2.1.1). PREMISES HAD INFORMATION PANEL ONLY AT EXPOSURE 4
#39108855N
Oct 29, 2024
IN VIOLATION
$1,250
DOB (6)
IssuedViolationStatus
Nov 4, 2026IMMEDIATE EMERGENCY
REMEDY: ERECT SHED
#20693
DOB VIOLATION - ACTIVE
Oct 15, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING BUILDING IN A CODE COMPLIANT MANNER.AS NO TED AT TIME OF INSPECTION,OBSERVED ON EXP1 SOUTH ELEV,CRACKS AND SPALL ING IN PARAPET BRICK WORK AT THE SOUTHEAST END;LOOSE ROTTEN FASCIA BOA RD ON THE SOUTHWEST END OF PARAPET/ROOF.EXP4 EAST ELEV:CRACKS,SPALLING DISINTERGRATING
#SR0702RF
DOB VIOLATION - ACTIVE
Apr 6, 2026CONSTRUCTION
FTC W/COMMISSIONER'S ORDER CONTROL#348099 VIO#030426PI40701TC DATED 3/4/26 REQUIRING OWNER TO SUBMIT A CORRECTIVE ACTION PLAN BY 4/04/26 AS OF 4/06/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#348099 VIO#030426PI40701TC
#PI40702TC
DOB VIOLATION - ACTIVE
Mar 4, 2026CONSTRUCTION
CORRECTIVE ACTION PLAN REQ'D-OBSVD SEVERAL CRACKS @ PARAPET LEVEL CRACKS @ EXP1/4 CORNER AND CRACKED MASONRY AT 3/4 CORNER. OBSVD LOOSE ROOF TILE AT EXP4. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NY TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 04/04/2026
#PI40701TC
DOB VIOLATION - ACTIVE
Mar 4, 2026CONSTRUCTION
FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD SEVERAL CRACKS PARAPET LEVEL @ EXP1/4 CORNER ALSO @EXP3/4 CORNER, ALSO OBSVD LOOSE SLATE TILE AT EXP4. ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY SARTING 2024. SUBMIT ANNUAL PARAPET REPORT FOR 2025 TO BE REC'D BY DOB NO LATER THAN 03
#PI40702TC
DOB VIOLATION - ACTIVE
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2401740
DOB VIOLATION - ACTIVE
DOB NOW Safety (7)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
HPD (18) · C 1 · B 11 · A 6
IssuedClassViolationCorrect by
Jun 22, 2026BApt 1E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW COUNTER BALANCE AT LOWER AND UPPER SASH IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJul 27, 2026
Jun 18, 2026CApt 1E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJul 14, 2026
Jun 18, 2026BApt 1E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQAURE FEET AT CEILING IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJul 23, 2026
Jun 18, 2026BApt 1E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJul 23, 2026
Jun 18, 2026AApt 1E · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTSep 21, 2026
Jun 18, 2026BApt 1E · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJul 23, 2026
Jun 18, 2026BApt 1E · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJul 23, 2026
Jun 18, 2026BApt 1E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJul 23, 2026
Jun 18, 2026BApt 1E · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJul 23, 2026
Jun 1, 2026A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMASep 4, 2026
Oct 21, 2025B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF HOUSEHOLD ITEMS AT 5TH STORY BALCONY AT 1ST STACK FROM WEST AT NORTH AT FIRE ESCAPENov 25, 2025
Oct 21, 2025B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING, NORTH, EAST AND SOUTH WALLS AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORYNov 25, 2025
Oct 21, 2025A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, NORTH, EAST AND SOUTH WALLS AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORYJan 24, 2026
Oct 21, 2025A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYJan 24, 2026
Oct 21, 2025A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYJan 24, 2026
Oct 21, 2025A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORYJan 24, 2026
Oct 21, 2025B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORYNov 25, 2025
Oct 21, 2025B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF HOUSEHOLD ITEMS AT 2ND STORY BALCONY AT 1ST STACK FROM EAST AT SOUTH AT FIRE ESCAPENov 25, 2025

Issued in the last 120 days

DateSourceWhatNow
Nov 4, 2026DOBIMMEDIATE EMERGENCY: REMEDY: ERECT SHEDOpen
Oct 15, 2026DOBCONSTRUCTION: FAILURE TO MAINTAIN BUILDING BUILDING IN A CODE COMPLIANT MANNER.AS NO TED AT TIME OF INSPECTION,OBSERVED ON EXP1 SOUTH ELEV,CRACKS AND SPALL ING IN PARAPET BRICK WORK AT THE SOUTHEAST END;LOOSE ROTTEN FASCIA BOA RD ON THE SOUTHWEST END OF PARAPET/ROOF.EXP4 EAST ELEV:CRACKS,SPALLING DISINTERGRATING Open
Sep 16, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. DOB VIO 030426PI40702TC AND DOB CONTROL #348100. DATED 03/04/2026. NO COMPLIANCE ON FILE FOR ANNUAL PARAPET OBSERVATION REPORT. REMEDY: COMPLY WITH THE COMMISSIOOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 4:38 PM ET. BBL 4053280015.

Look up another building