5 floors · 9 apartments · 6,860 sq ft · built 2022 · class C1 · owner of record: Hsk 1544 Brooklyn Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 434 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 3, 2022 | Construction CLASS - 1 BC3301.1.1 BC3301.13.16 RESPONSIBILITY FOR SAFETY.AT TIME OF INSPECTION OBSERVED OPEN/ACTIVE SITE.GC FAILED TO ENSURE PROPER SAFETY AT SITE.SITE WAS OPEN WITH ACTIVE WORK ONGOING EVEN THOUGH THERE WAS NO CS OR #35641768P | Jun 15, 2022 DEFAULT | $6,250 |
| Sep 10, 2021 | Construction CLASS - 1 BC2104.6 FAILURE TO PROVIDE MASONRY CMU BLOCK WALL CONSTRUCTION BRACING ACCORDANCE WITH TMS 602/ACK 530.1/ASCE 6 SECTION 3.3E AS NOTED:AT TIME OF INSPECTION AT ACTIVE JOBSIT OBSERVED CMU BLOCK MASONRY WALL FROM #35588843X | Mar 13, 2023 IN VIOLATION | $625 |
| Sep 10, 2021 | Construction CLASS - 1 BC 3301.7 FAILURE TO PROVIDE APPROVED PE CONSTRUCTION DOCUMENTS.AS NOTED: AT TIME OF INSPECTION AT ACTIVE CONSTRUCTION SITE OBSERVED CMU REPAIR OF ELEVATOR SHEAR WALLS UPON REQUEST OF DETAILS OF REPAIR BY ENGIN #35588841M | Jun 22, 2022 IN VIOLATION | $2,500 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 1:27 PM ET. BBL 3050100061.