2 floors · 1 apartments · 3,600 sq ft · built 1920 · class K4 · owner of record: Y&K 155 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-10-04 (Accepted). Agency page | Dec 31, 2026 in 68 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 312 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 799 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 6, 2026 | Construction CLASS - 2 GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039555236Z, ISSUED ON 6.08.2026. .. #39557610Z | Oct 15, 2026 DEFAULT | $1,280 |
| Jun 8, 2026 | Unknown CLASS - 2 AT THE TIME OF MY INSPECTION OBSERVED CS WASN'T PRESENT BUT COMPETENT WAS BUT THE SITE CONDITIONS 3301.13.7 CS FAILED TO ADDRESS, OPEN LEDGES WITHOUT INSTALLING GUARDRAIL SYSTEM,NO EGRESS/INGRESS ACCESS,ACTIVE #39555234P | Nov 5, 2026 PENDING | $5,000 |
| Jun 8, 2026 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE FAILED TO ADDRESS HOUSEKEEPING DUTIES WITH OVERLOADED DEBRIS OBSTRUCTING PATHWAYS FOR ACTIVE WORKERS, EMT RESPONDENTS, & INSPECTORS. BC 3303.4 & 27-1018 SITE MU #39555235R | Dec 3, 2026 | $2,500 |
| Jun 8, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION OBSERVED SITE WITHOUT DEMO NOTIFICATION UNDER PERMIT # M00978747 BC 3306.3& 27-195 .SITE FAILED TO ADDRESS NOR PROVIDE DEMOLITION NOTIFICATION FOR ACTIVELY COMMENCING ONGOING DEMO OPER #39555236Z | Dec 3, 2026 PENDING | $2,500 |
| Jun 8, 2026 | Unknown CLASS - 1 AT THE TIME OF MY INSPECTION OBSERVED SITE WITHOUT ANY GUARDRAIL SYSTEM INSTALLED THROUGHOUT ACTIVE SITE DURING DEMO/CONSTRUCTION OPERATIONS. SITE UNDER PERMIT # M00978747-I1 FAILED TO ADDRESS IMMEDIATE NEED FO #39555233N | Dec 3, 2026 | $5,000 |
| Jun 8, 2026 | Unknown CLASS - 1 AT THE TIME OF MY INSPECTION OBSERVED SITE WITHOUT ANY IMMEDIATE INGRESS/EGRESS ACCESS FOR ACTIVE WORKERS, EMT RESPONDENTS, & INSPECTORS 3303.9 SITE MUST PROVIDE THESE SAFETY FACTORS ON ALL ACTIVE DEMO/CONSTRUC #39555232L | Dec 3, 2026 | $5,000 |
| May 12, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED LIGHTING NOT ILLUMINATED AT EXPOSURES 1 AND 2 OF INACTIVE 4-STORY BUILDING LOCATED AT 154 STANTON STREET AND 162-164 SUFFOLK STREET, CONTRARY TO BC 3307.6.4.7. COND #39554011N | Feb 4, 2027 | $2,400 |
| Jul 22, 2025 | Construction CLASS - 1 ATOI NO ACTIVE CONSTRUCTION IS IN PROGRESS. FENCE ERECTED IN THE PROPERTY IS CONTRARY TO THE APPROVED PLANS SUBMITTED TO THE DEPARTMENT. CONSTRUCTION ROLLING GATE IS IN A WRONG LOCATION., CONFORM WORK TO APPROV #39154567X | Dec 7, 2026 | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #01929 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #01981 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #00855 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 10, 2020 | B | Apt UNIT2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | C | Apt UNIT2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCES AT LOWER SASH 2ND WINDOW FROM EAST IN THE 5th ROOM FROM NORTH AT WEST LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 18, 2020 |
| Feb 10, 2020 | A | Apt UNIT2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR EAST WALL IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | May 15, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ELECTRICAL OUTLET AT EAST WALL IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE ELECTRICAL OUTLET AT EAST WALL IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN CLOSET AT EAST IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT EAST WALL IN CLOSET IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCES AT LOWER SASH AT WINDOW IN THE BATHROOM LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCES AT LOWER SASH AT WINDOW AT WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | A | Apt UNIT2 · § 27-2005 ADMIN. CODE: REFIT UPPER AND LOWER SASH AT WINDOW AT WEST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | May 15, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCES AT LOWER SASH AT 1ST WINDOW FROM EAST IN THE 5th ROOM FROM NORTH AT CENTER LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT CENTER OF FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Feb 10, 2020 | B | Apt UNIT2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE BATHROOM LOCATED AT APT UNIT2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2020 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 6, 2026 | ECB | Construction: GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039555236Z, ISSUED ON 6.08.2026. .. | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 9:55 AM ET. BBL 1003500037.