4 floors · 4 apartments · 3,640 sq ft · built 1920 · class S4 · owner of record: Roy Savelli, As Trustee
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
None open.
| Issued | Violation | Status |
|---|---|---|
| Apr 24, 2019 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONER'S ORDER # 334056 ISSUED ON 8/9/18 TO REPAIR BLDG UNDER PERMIT.PERMIT FOR REPAIR WORK TO BE OBTAINED BY 9/1/18 AS OF 4/24/19 NO JOB HAS BEEN FILED WITH THE DEPARTMENT COMPLY WITH COMMISSIONER ORDER # 334056 IMMEDIATELY #FEU10401XC | DOB VIOLATION - ACTIVE |
| Aug 9, 2018 | CONSTRUCTION FTM 4 STRY+CELL SEMI ATTACH MASONRY WALLS&WOOD FRAMED FLRS.BLDG EXT WALLS IN DISREPAIR AT FRONT WALL PARAPET IS SEPARATING&BOWING.VARIOUS CRACK ON BRICK ARE NOTED THROUGHOUT.CRACK&SPALL STUCCO FOUND AT SOUTH WALL.BRICK CRACK NOTED AT FRONT WALL.REMEDY:OWN ENGAGE LIC PE&CONT'R EVAL BLDG&PERF RPR.FILE #FEU10401XC | DOB VIOLATION - ACTIVE |
| Aug 7, 2018 | CONSTRUCTION EMERG WRK.4 STRY+CELL MASONRY WALLS&WOODFRAME BLDG.FRONT PARAPET IS BOWING&BRICKS ARE MISS AT CORNER W/NORTH WALL LOOSE BRICK&COOPING IN DANGER OF FALL.FIRE ESCAPE DETER&1 STEP IS LOOSE.REMEDY:OWN IMMED PROV FIRE GAURD UNTIL OVERHEAD HAZZARD BEEN REMOVE&RPRS OF FIRE ESCAPE ARE PERFORM.REMOVE ALL LOO #FEU10401XC | DOB VIOLATION - ACTIVE |
| Aug 6, 2018 | CONSTRUCTION DUE TO BUILDING AT 156 8TH AVENUE HAD FACADE COLLAPSE AT THE 4TH FLOOR AFFECTING THE MASONRY FACADE AT 154 8TH AVENUE #CER02CM | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)