Brooklyn · Block 3493 · Lot 27 · 11212

1535 Pitkin Avenue

3 floors · 5,080 sq ft · built 1930 · class O5 · owner of record: 435 Rockaway Llc

9open violations
$29,875ECB/OATH penalties owed
0HPD class C (immediately hazardous)
61dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 61 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-25 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (5) · $29,875 owed
IssuedViolationHearingBalance
Apr 22, 2026Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO OBTAIN WORK PERMIT FOR VIOLATION #39130380J. NO PERMIT/APPROVED PLANS TO INSTALL ELECTRICAL SPLIT A/C UNITS., COMPLY WITH COMMISSIONER'S ORDER
#39185622L
Jun 3, 2027
DEFAULT
$12,500
Nov 18, 2024Construction CLASS - 2
ATOI OBSERVED AT EXPOSURE 3 REAR YARD OF PREMISES, AN ILLEGAL STRUCTURAL ATTACHED SHED ENCLOSED WITH COMPLETE ROOF. COMBUSTIBLE WOOD STRUCTURE IS APPROXIMATELY 10FT IN HEIGHT. NO PERMIT FILED FOR WORK DONE., OB
#39130491M
Jan 22, 2025
DEFAULT
$6,250
Nov 15, 2024Construction CLASS - 2
FAILURE TO MAINTAIN. APPRX. 8'X3' OPENING WAS OBSERVED IN THE WALL AT THE BACK OF 1ST-FLR COMMERCIAL SPACE, EXPOSING IT TO THE ENVIRONMENT., REPAIR AND/OR REPLACE
#39130379M
Jan 22, 2025
DEFAULT
$3,125
Nov 15, 2024Unknown CLASS - 1
ECB NOV ISSUED FOR ELECTRICAL WW/OP. ATOI OBSERVED THE INSTALLATION OF ELECTRICAL CONNECTIONS RELATED TO SPLIT SYSTEM AC UNITS. WORK 100% COMPLETE., OBTAIN PERMIT
#39130380J
Jan 22, 2025
DEFAULT
$8,000
Aug 23, 1995Boilers Non-Hazardous
49 INSTALL BACK FLOW PREVENTER.REMOVE WAIST OIL FROM BOILER ROOM.
#32013183N
Nov 6, 1995
WRITTEN OFF
$0
DOB (2)
IssuedViolationStatus
Jan 22, 2025FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00217
DOB VIOLATION - ACTIVE
Aug 22, 1991CONSTRUCTION

#16C02
VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 16)
Active
Jan 22, 2025AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 4:51 PM ET. BBL 3034930027.