Brooklyn · Block 6564 · Lot 77 · 11230

1533 Mcdonald Avenue

2 floors · 4 apartments · 2,800 sq ft · built 1911 · class C3 · owner of record: Tang, Kai Qiang

16open violations
$0ECB/OATH penalties owed
7HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 412 days
Next cycle year 2027

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (16) · C 7 · B 7 · A 2
IssuedClassViolationCorrect by
Apr 17, 2023CApt 2R · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Apr 21, 2023
Apr 17, 2023CApt 2R · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Apr 21, 2023
Mar 20, 2023CApt 2R · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION THE WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTMar 26, 2023
Mar 20, 2023BApt 2R · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOOD DOOR FRAME AT WEST IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTApr 24, 2023
Mar 20, 2023BApt 2R · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ROTTED WOOD BASE CABINET AT WEST IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTApr 24, 2023
Mar 20, 2023BApt 2R · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTApr 24, 2023
Nov 17, 2021BApt 1R · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHDec 22, 2021
Nov 17, 2021BApt 2F · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 5, 2022
Nov 17, 2021C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Nov 21, 2021
Nov 8, 2021CApt 2R · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Nov 12, 2021
Sep 2, 2021CApt 2R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTSep 28, 2021
Sep 2, 2021AApt 2R · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTDec 6, 2021
Dec 11, 2019A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORYMar 15, 2020
Dec 11, 2019B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF MATTRESS AND HOUSEHOLD ITEMS AT PUBLIC HALL, 2nd STORYJan 15, 2020
Dec 11, 2019B§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DEVICE (HASP AND CATCH ARRANGED TO BE PADLOCKED) AT SCUTTLE COVER AT PUBLIC HALL, 2nd STORYJan 15, 2020
Dec 11, 2019C§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORYDec 19, 2019

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 11:33 AM ET. BBL 3065640077.

Look up another building