3 floors · 2 apartments · 2,700 sq ft · built 1930 · class S2 · owner of record: Larisa Baturow, As Trustee
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 426 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-10 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 6, 2017 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO #35236883L ISSUED ON 10/25/17 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.FOR WORK W/OUT A PERMIT.REM:COMPLY W/COMM'S ORDER & #35282069Y | Apr 23, 2018 WRITTEN OFF | $0 |
| Oct 25, 2017 | Construction CLASS - 1 WORK W/OUT A PERMIT. OBSERVED: 1 STORY STRUCTURE (APPROX 7' X 16') ERECTED @ EXP#3 (REAR YARD) INCLUDING ROOF & DOOR ENTRANCE. THE STRUCTURE IS DEVATED ON APPROX 2' OF FINISH FLR. NO DOB PERMITS ON FILE FOR THI #35236883L | Apr 6, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #12910 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 26, 2006 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL AT PUBLIC HALL, 2nd STORY | Oct 4, 2006 |
| Jun 26, 2006 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SHEETROCK AT WEST WALL AT PUBLIC HALL, 2nd STORY | Aug 5, 2006 |
| Jun 23, 2006 | B | SECTION 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 3rd STORY | Aug 2, 2006 |
| Jun 23, 2006 | B | Apt 3FL · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORY | Aug 2, 2006 |
| Jun 23, 2006 | A | SECTION 27-2005 ADMIN. CODE: REFIT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Oct 1, 2006 |
| Jun 8, 2006 | B | Apt 3FL · SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING TILE AT WEST WALL IN THE BATHROOM LOCATED AT APT 3FL, 3rd STORY | Jul 18, 2006 |
| Jun 8, 2006 | B | Apt 3FL · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3FL, 3rd STORY | Jul 18, 2006 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 11:05 PM ET. BBL 3075570080.