17 floors · 24 apartments · 74,876 sq ft · built 2024 · class D8 · owner of record: Zdj E 86 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 113 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 74,876 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1515). Agency page | Dec 31, 2035 in 3348 days | Next due 2035 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 24, 2026 | Construction CLASS - 1 RESPONDING TO AN INCIDENT WHERE A WORKER GOT SIDESWIPE FROM AN ONCOMING VEHICLE WHILE MOVING THE BARRIERS. INSPECTION REVEAL THAT THERE WAS NOT ENOUGH FLAG-PERSONS IN PLACE TO SUPPORT THE DELIVERIES, DIRECT THE #39557052N | Nov 12, 2026 | $10,000 |
| Jul 10, 2026 | Construction CLASS - 1 OBSERVED FLOOR OPENINGS PROTECTED WITH INADEQUATE GUARDRAIL SYSTEMS. TEMPORARY WOOD RAILS AND ORANGE SAFETY MESH WERE IMPROPERLY INSTALLED AND FAILED TO PROVIDE CODE-COMPLIANT TOP RAILS, MIDRAILS, AND ADEQUATE #39556473R | Dec 3, 2026 | $5,000 |
| Jul 10, 2026 | Unknown CLASS - 1 3301.4 OBSERVED ACTIVE CONSTRUCTION AT A 17-STORY BUILDING WITH CONCRETE SAFETY STRAPS IMBEDDED THROUGHOUT THE SITE. UPON REQUEST, THE CONSTRUCTION SUPERINTENDENT FAILED TO PROVIDE REQUIRED INSPECTION LOGS. WOR #39556476M | Dec 3, 2026 | $5,000 |
| Dec 29, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION, OBSERVED SOLID CONSTRUCTION FENCE ALONG PUBLIC FRONTAGE LACKING REQUIRED VIEWING PANELS EVERY 25 LINEAR FT PER BC 3307.7.3. FAILURE TO PROVIDE REQUIRED NUMBER OF PANELS OBSTRUCTS VISIBILI #39548564M | Oct 9, 2026 IN VIOLATION | $1,000 |
| Dec 24, 2025 | Unknown CLASS - 1 NOTE: AT THE TIME OF INSPECTION I OBSERVED ON GOING CONCRETE OPERATIONS ADJACENT TO THE SIDEWALK SHED WITHOUT THE INSTALLATION OF THE REQUIRED PROTECTIVE MEASURES FOR THE PUBLIC AS PER 3307.4.7. THIS CONDITION #39548494X | Oct 15, 2026 IN VIOLATION | $2,500 |
| Sep 16, 2025 | Construction CLASS - 1 NO SITE-SPECIFIC FORMWORK DESIGN DRAWINGS PRESENT PER 3301.7.AS NOTED AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE 17 STORY NEW BUILDING CONCRETE PLACEMENT WORK ON 3RD FLOOR SLAB APPROX.220 CUBIC YARDS #35718314N | Jan 14, 2027 | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 24, 2026 | ECB | Construction: RESPONDING TO AN INCIDENT WHERE A WORKER GOT SIDESWIPE FROM AN ONCOMING VEHICLE WHILE MOVING THE BARRIERS. INSPECTION REVEAL THAT THERE WAS NOT ENOUGH FLAG-PERSONS IN PLACE TO SUPPORT THE DELIVERIES, DIRECT THE | Closed |
| Jul 10, 2026 | ECB | Construction: OBSERVED FLOOR OPENINGS PROTECTED WITH INADEQUATE GUARDRAIL SYSTEMS. TEMPORARY WOOD RAILS AND ORANGE SAFETY MESH WERE IMPROPERLY INSTALLED AND FAILED TO PROVIDE CODE-COMPLIANT TOP RAILS, MIDRAILS, AND ADEQUATE | Closed |
| Jul 10, 2026 | ECB | Unknown: 3301.4 OBSERVED ACTIVE CONSTRUCTION AT A 17-STORY BUILDING WITH CONCRETE SAFETY STRAPS IMBEDDED THROUGHOUT THE SITE. UPON REQUEST, THE CONSTRUCTION SUPERINTENDENT FAILED TO PROVIDE REQUIRED INSPECTION LOGS. WOR | Closed |
| Jul 10, 2026 | ECB | Construction: OBS SIDEWALK SHED INSTALLED IN A NONCONFORMING CONDITION. REQUIRED STRUCTURAL COMPONENTS SHOWN ON THE APPROVED CONSTRUCTION DOCUMENTS, INCLUDING TRUSSES, CROSS BRACES, BAYS,&POSTS, WERE MISSING AT MULTIPLE LOCA | Closed |
| Jul 10, 2026 | ECB | Construction: OBSERVED SUPPORTED SCAFFOLD ERECTED IN A NONCONFORMING CONDITION. STAIR TOWERS REQUIRED BY THE APPROVED PLANS WERE MISSING AT THE GROUND LEVEL AND AT THE 11TH AND 13TH FLOORS. SCAFFOLD ACCESS WAS NOT CONTINUOUS | Closed |