Manhattan · Block 997 · Lot 10 · 10036

153 West 44 Street

48 floors · 471,985 sq ft · built 1988 · class H1 · owner of record: Cdl West 45th Streetl.P.

33open violations
$3,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
168dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 471,985 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 997). Agency page

Dec 31, 2027
in 412 days
Next due 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $184,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 464 days
No Cycle 10 report on record yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-27 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4) · $3,750 owed
IssuedViolationHearingBalance
Apr 16, 2026Elevators CLASS - 1
CEASE USE ITEM: UPON INSPECTION ONE HOIST ROPE WAS OBSERVED TO HAVE A BURST STRAND. REPLACE ENTIRE SET OF MACHINE HOIST ROPES AS PER (ASME A17.1 SECTION 8.6.3.2). ELEVATOR MUST BE RETESTED WITH FULL RATED LOAD
#39184911N
Jun 25, 2026
IN VIOLATION
$1,250
May 9, 2024Construction CLASS - 1
UNLAWFUL ACT. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. NOTE: DOB #030317LLF01WW OWNER REQUIRED TO PROVIDE A PE/RA REPORT TO THE FACADE UNIT DUE TO BROKEN G;ASS PANEL BY 3/24/17. AS OF 05/09/2024 NO REPORT H
#35682023L
Dec 10, 2024
IN VIOLATION
$2,500
Mar 3, 2017Construction CLASS - 1
IRCNY-MISC,RS-MISC/OWNER FAILED TO REPAIR BUILDING EXTERIOR FACADE AT WEST ELEVATION,EXPO#2 GLASS PANNEL WITH TEMP CLIPS INSTALLED AT VARIOUS LOCATION WITH IN THE TIME FRAME RECOMMENDED BY QEW1.QEW1 RECOMMENDED
#35210498J
Apr 20, 2017
DEFAULT
$0
Mar 3, 2017Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NORTH ELEVATION,EXPO#1(W-44 ST).THERE IS SEVERAL GLASS PANELS BROKEN/DAMAGE SUCH AS 37/38/49 & 50TH FLR AND TOP FLR LEDGE WERE DAMAGE WERE OBSECURE
#35210497H
Jun 8, 2017
IN VIOLATION
$0
DOB (16)
IssuedViolationStatus
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2400233
DOB VIOLATION - ACTIVE
Mar 3, 2017CONSTRUCTION
FTM. FACADE AND APPURTENANCES. AT GLASS CURTAIN WALL FACADE A PANE OF GLASS FELL TO STREET/SIDEWALK FOR UNKNOWN REASONS. REMEDY: IMMED RETAIN SERVICES OF NYS DESIGN PROF WITH GLASS CURTAIN WALL EXPERTISE TO INSPECT 100% OF CURTAIN WALL AT ALL EXPOSURES TO DETERMINE SAFETY OF SAME CAUSE OF FAILURE
#LLF01WW
DOB VIOLATION - ACTIVE
May 1, 2013ELEVATOR

#9028/442876
DOB VIOLATION - ACTIVE
Jun 8, 2009ELEVATOR

#305772/9011
DOB VIOLATION - ACTIVE
Jun 8, 2009ELEVATOR

#305774/9011
DOB VIOLATION - ACTIVE
Jun 8, 2009ELEVATOR

#305773/9011
DOB VIOLATION - ACTIVE
Jun 5, 2009ELEVATOR

#305770/9011
DOB VIOLATION - ACTIVE
Jun 5, 2009ELEVATOR

#305771/9011
DOB VIOLATION - ACTIVE
May 29, 2009ELEVATOR

#306008/9011
DOB VIOLATION - ACTIVE
May 29, 2009ELEVATOR

#305767/9011
DOB VIOLATION - ACTIVE
May 29, 2009ELEVATOR

#305766/9011
DOB VIOLATION - ACTIVE
May 29, 2009ELEVATOR

#305765/9011
DOB VIOLATION - ACTIVE
Jan 14, 2004ELEVATOR

#9011/189705
DOB VIOLATION - ACTIVE
Oct 23, 2002ELEVATOR

#1P36386
DOB VIOLATION - ACTIVE
Jan 30, 1999ELEVATOR
1¢35799
#9444/100341
DOB VIOLATION - ACTIVE
Sep 18, 1991CONSTRUCTION

#C4AM02
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (14)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 9:29 AM ET. BBL 1009970010.

Look up another building