3 floors · 3 apartments · 2,664 sq ft · built 1901 · class C0 · owner of record: Levy, Eddie
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 16, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35379312X ISSUED ON 2/15/19 AND TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.DWELLING CONVERTED.REMEDY:COMP #35562798K | Dec 3, 2021 DEFAULT | $3,125 |
| Sep 16, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35514841K ISSUED ON 12/24/19 AND TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT PERMIT.REMEDY:CO #35562799M | Dec 3, 2021 DEFAULT | $6,250 |
| Sep 16, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35379313H ISSUED ON 02/15/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. DWELLING CONVERTED. REMEDY: COMPLY W/COMM'S ORDER & #35562796R | Dec 3, 2021 DEFAULT | $3,125 |
| Sep 16, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35379319J ISSUED 02/15/19 AND TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.DWELLING CONVERTED.REMEDY:COMPLY #35562795P | Dec 3, 2021 DEFAULT | $3,125 |
| Sep 16, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35379315L ISSUED ON 02/15/09 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. DWELLING CONVERTED. REMEDY: COMPLY W/COMM'S ORDER & #35562797Z | Dec 3, 2021 DEFAULT | $3,125 |
| Jan 15, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION 335379316N ISSUED ON 02/15/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.WORK W/OUT A PERMIT.NOTED:2ND #35524072Y | Apr 2, 2021 DEFAULT | $12,500 |
| Dec 24, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35379316N ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 102-01.1 AND 1RCNY 102-01.FOR WORK WITHOUT A PERMIT #35514841K | Feb 7, 2020 DEFAULT | $6,250 |
| Dec 24, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35379312X ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 201-01.1 AND 1RCNY 102-01.FOR:DWELLING CONVERTED,MA #35514839L | Feb 7, 2020 DEFAULT | $3,125 |
| Dec 24, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35379313H ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 201-01.1 AND 1RCNY 102-01.FOR:DWELLING CONVERTED,MA #35514838J | Feb 7, 2020 DEFAULT | $3,125 |
| Dec 24, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35379314J ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1 RCNY 102-01.FOR DWELLING CONVERTED M #35514840Z | Feb 7, 2020 DEFAULT | $3,125 |
| Dec 24, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35379315L ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR DWELLING CONVERTED,MA #35514837H | Feb 7, 2020 DEFAULT | $3,125 |
| Oct 28, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35379312X ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REMEDY:COMPLY W/ COMMISSIO #35431003H | Dec 20, 2019 DEFAULT | $3,125 |
| Oct 28, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35379315L ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REMEDY:COMPLY W/ COMMISSIO #35431005L | Dec 20, 2019 DEFAULT | $3,125 |
| Oct 28, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35379314J ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REMEDY:COMPLY W/ COMMISSIO #35431002X | Dec 20, 2019 DEFAULT | $3,125 |
| Oct 28, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35379313H ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REMEDY:COMPLY W/ COMMISSIO #35431004J | Dec 20, 2019 DEFAULT | $3,125 |
| Oct 28, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35379316N ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REMEDY:COMPLY W/ COMMISSIO #35431001Y | Dec 20, 2019 DEFAULT | $6,250 |
| Sep 10, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35379315L ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMISS #35428700X | Nov 1, 2019 DEFAULT | $3,125 |
| Sep 10, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35401336Z ISSUED ON 7/17/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMISS #35428701H | Nov 1, 2019 DEFAULT | $6,250 |
| Sep 10, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35379314J ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMISS #35428049X | Nov 1, 2019 DEFAULT | $3,125 |
| Sep 10, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35379313H ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMISS #35428048Y | Nov 1, 2019 DEFAULT | $3,125 |
| Sep 10, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35379312X ISSUED ON 2/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMISS #35428047M | Nov 1, 2019 DEFAULT | $3,125 |
| Jul 17, 2019 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35379316N ISSUED ON 05/09/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35401336Z | Sep 6, 2019 DEFAULT | $6,250 |
| Jul 17, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35379315L ISSUED ON 02-15-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35401332L | Sep 6, 2019 DEFAULT | $3,125 |
| Jul 17, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35379313H ISSUED ON 02-15-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35401335R | Sep 6, 2019 DEFAULT | $3,125 |
| Jul 17, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35379314J ISSUED ON 02-15-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35401333N | Sep 6, 2019 DEFAULT | $3,125 |
| Jul 17, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35379314J ISSUED ON 02-15-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35401334P | Sep 6, 2019 DEFAULT | $3,125 |
| May 9, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ODER CONTAINED IN SUMMONS/VIOLATION#35379315L ISSUED ON 02/15/19 AND TO FILE A CERTICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSIONER #35399126K | Jul 5, 2019 DEFAULT | $3,125 |
| May 9, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IS SUMMONS/VIOLATION#35379312X ISSUED ON 02/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSIO #35399128Y | Jul 5, 2019 DEFAULT | $3,125 |
| May 9, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35379314J ISSUED ON 02/15/19 AND TO FILE A CERTIFICATE TO CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSIO #35399125Z | Jul 5, 2019 DEFAULT | $3,125 |
| May 9, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35379313H ISSUED ON 02/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSIO #35399133Z | Jul 5, 2019 DEFAULT | $3,125 |
| May 9, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER IN SUMMONS/VIOLATION#35379316N ISSUED ON 02/15/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR WORK WITHOUT A PERMIT.REM:COMPL #35399127M | Jul 5, 2019 DEFAULT | $6,250 |
| Feb 15, 2019 | Quality of Life CLASS - 1 DWELLING CONVERTED,MAINTAINED OR OCCUPIED WITH (3) OR MORE ADDITIONAL DWELLING UNITS THAN LEGALLY AUTHROIZED BY THE C OF O OR OFFICIAL RECORDS.NOTED:D.O.B. RECORDS INDICATES A (3) FAMIL.ALTERATION WORK NOTED:AT #35379315L | Apr 5, 2019 DEFAULT | $57,500 |
| Feb 15, 2019 | Quality of Life CLASS - 1 DWELLING CONVERTED,MAINTAINED OR OCCUPIED WITH (3) OR MORE ADDITIONAL DWELLING UNITS THAN LEGALLY AUTHORIZED BY THE C OF O OR OFFICIAL RECORDS.NOTED:DOB RECORDS INDICATES A (3) FAMILY,3 STORY (DWELLING).RESIDEN #35379312X | Apr 5, 2019 DEFAULT | $57,500 |
| Feb 15, 2019 | Quality of Life CLASS - 1 DWELLING CONVERTED,MAINTAINED OR OCCUPIED WITH (3) OR MORE ADDITIONAL DWELLING UNITS THAN LEGALLY AUTHORIZED BY THE C OF O OR OFFICIAL RECORDS.NOTED:D.O.B. RECORDS INDICATE A (3) FAMILY 3 STORY (DWELLING)RESIDE #35379314J | Apr 5, 2019 DEFAULT | $57,500 |
| Feb 15, 2019 | Quality of Life CLASS - 1 DWELLING CONVERTED,MAINTAINED.OR OCCUPIED WITH (3) OR MORE ADDITIONAL DWELLING UNITS THAN LEGLLY AUTHORIZED BY THE C OF O OR OFFICIAL RECORDS.NOTED:ALTERED AND OCCUPIED INDICATES A (3) FAMILY ,3 STORY (DWELLING #35379313H | Apr 5, 2019 DEFAULT | $57,500 |
| Feb 15, 2019 | Construction CLASS - 1 WORK WITHOUT A PERMIT.NOTED:AT 2ND FLOOR KITCHEN REMOVED-STOVE & RESIDENTIAL SINK PLUMBING AND APPLIANCES.OBTAIN PERMIT #35379316N | Apr 5, 2019 DEFAULT | $6,250 |
| Feb 5, 2019 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR DEPARTMENT OF BUILDINGS RECORDS. LEGAL CLASS "A" APARTMENT. ILLEGALLY CREATED INTO SINGLE ROOM OCCUPANCIES (SROS)AT 2ND STORY FULL BATHROOM AND A KITCHEN #35243356P | May 31, 2019 DEFAULT | $3,125 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 5, 2022 | B | Apt 3 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APROX. 8 SQ. FT.) IN THE BATHROOM LOCATED AT APT 3 LOWER LEVEL, 2nd STORY, APARTMENT AT EAST ORIGINAL VIOLATION 15102549 ISSUED 30-MAR-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a( | Sep 9, 2022 |
| Apr 21, 2022 | C | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES FOR ALL 3 APARTMENTS AND HEATING PLANT | Apr 27, 2022 |
| Apr 21, 2022 | C | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES IN ALL THREE APARTMENTS | Apr 27, 2022 |
| Apr 7, 2022 | C | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES IN PARTMENTS AND ALL PUBLIC/COMMON AREAS THROUGOUT THE ENTIRE BUILDING | Apr 13, 2022 |
| Apr 7, 2022 | C | Apt 3 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3 LOWER LEVEL, 2nd STORY | Mar 31, 2022 |
| Jan 31, 2022 | C | Apt 3FL · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHTUB AND WASHBASIN IN THE BATHROOM LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 6, 2022 |
| Jan 31, 2022 | B | Apt 3FL · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE BATHROOM LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 7, 2022 |
| Jan 21, 2020 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM , AT PUBLIC HALL, 1st STORY | Jan 29, 2020 |
| Jan 17, 2020 | C | Apt 2 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 17, 2020 |
| Jan 17, 2020 | C | Apt 2 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 17, 2020 |
| Feb 13, 2019 | C | Apt 2NDFL · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 2NDFL, 2nd STORY | Mar 6, 2019 |
| Feb 7, 2019 | C | Apt 2 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 6, 2019 |
| Feb 7, 2019 | C | Apt 2 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APPROX 30 SQUARE FEET AT BATHROOM CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 28, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 9:57 AM ET. BBL 2039170013.