Brooklyn · Block 6769 · Lot 18 · 11210

1528 East 23 Street

5 floors · 85,928 sq ft · built 1924 · class W1 · owner of record: Nyc Department Of Education

18open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
164dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 85,928 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 164 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 164 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 408 days
Next cycle year 2027
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6769). Agency page

Dec 31, 2029
in 1139 days
Next due 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-05 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (15)
IssuedViolationHearingBalance
Jan 22, 2026Construction CLASS - 2
REISSUE: 35684775N-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: STAIRWAY F HAS MISSING WINDOW PANELS. REMEDY: COMPLY WITH CODE.
#35725003L
Feb 17, 2026
POP/IN-VIO
$0
Jan 22, 2026Construction CLASS - 2
REISSUE: 35684777R-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: AT CELLAR LEVEL BOILER ROOM. WATER PENETRATION FROM FOUNDATION ANDLEAKS FROM WATER PUMP. REMEDY: COMPLY WITH CODE.
#35725001H
Feb 17, 2026
POP/IN-VIO
$0
Jan 22, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: GYM HAS, 2 EXITS, 2 DOORS EACH-ONE SET OPEN THE WRONG AND TURN KNOBS INSTEAD OF PUSHBAR. REMEDY: COMPLY WITH CODE.
#35725004N
Feb 17, 2026
POP/IN-VIO
$0
Jan 22, 2026Construction CLASS - 2
REISSUE: 35684776P-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRESTOP @ ELECTRIC ROOM. HOLES IN CEILING W/OUT FIRESTOP. REMEDY: COMPLY WITH CODE.
#35725002J
Feb 17, 2026
POP/IN-VIO
$0
Jan 22, 2026Construction CLASS - 2
REISSUE: 3568849P-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDOR PER BC 1006.1; 27-381., 5TH FLOOR EXIT 8 NEAR RM 515, 558. REMEDY: COMPLY WIT
#35725000X
Feb 17, 2026
POP/IN-VIO
$0
Feb 19, 2025Construction CLASS - 2
REISSUE #35663509H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: OBSERVED AT STAIRWAY EXIT F. MISSING VISION STAIR PANELS IN VARIOUS LOCATIONS. REMEDY: REPAIR AND/OR REPLACE.
#35684775N
Apr 28, 2025
POP/IN-VIO
$0
Feb 19, 2025Construction CLASS - 2
REISSUE #35663504Y; FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE-STOPPING PER BC 712.3; 27-345, OBSERVED IN CELLAR LEVEL AREA IN ELECTRICAL ROOM. MISSING FIRE-STOPPING ON SEVERAL HOLES IN CEIL
#35684776P
Apr 28, 2025
POP/IN-VIO
$0
Feb 19, 2025Construction CLASS - 2
REISSUE #35663510P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATED FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDOR PER BC1006.1; 27-381. OBSERVATION AT 5TH FLOORS EXIT 8 NEAR ROOM 515, 558, 3
#35688849P
Apr 28, 2025
POP/IN-VIO
$0
Feb 19, 2025Construction CLASS - 2
REISSUE #35663506M: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: OBSERVED AT CELLAR LEVEL BOILER ROOM. WATER PENETRATION FROM FOUNDATION AND LEVELS FROM WATER PUMP MACHINE. REMEDY: REPAIR/OR REPLACE.
#35684777R
Apr 28, 2025
POP/IN-VIO
$0
Mar 6, 2024Construction CLASS - 2
RE-ISSUE #35673070J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED AT CELLAR LEVEL IN THE BOILER ROOM, THERE IS SIGNS OF WATER PENETRATION. REMEDY: REPAIR AND/OR REPLACE.
#35663506M
May 6, 2024
POP/IN-VIO
$0
Mar 6, 2024Construction CLASS - 2
RE-ISSUE #35673067Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: OBSERVED AT STAIRWAY F THERE ARE SEVERAL MISSING VISION STAIR PANELS. REMEDY: REPAIR AND/OR REPLACE.
#35663509H
May 6, 2024
POP/IN-VIO
$0
Mar 30, 2023Construction CLASS - 2
REISSUE #35663261N(7/13/22)FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED DURING INSPECTION OF STAIRWELL DIVICERS/VISION PANEL MISSING & BROKEN/SHATTERED THROUGHOUT ENTIRE SCHOOL.REMEDY:RE
#35673067Z
Jun 21, 2023
POP/IN-VIO
$0
Mar 30, 2023Construction CLASS - 2
REISSUE #35663258M(7/13/22)FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED DURING INSPECTION OF CELLAR BOILER RM WALL HAS BECOME POROUS ALLOWING WATER TO PENETRATE INTO AREA.REMEDY:REPAIR A
#35673070J
Jun 21, 2023
POP/IN-VIO
$0
Jul 13, 2022Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED DURING INSPECTION OF BOILER ROOM,23RD ST SIDE EXTERIOR FOUNDATION WALL HAS BECOME POROUS ALLOWING WATER PENETRATION INTO THE BASEMENT.REM:REP
#35663258M
Feb 8, 2023
POP/IN-VIO
$0
Jul 13, 2022Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED DURING INSPECTION OF STAIRWAY F,VISION/STAIR PANEL MISSING ALL THROUGHOUT.REM:REPAIR AND/OR REPLACE.
#35663261N
Feb 8, 2023
POP/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (3)
IssuedViolationStatus
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 9:51 PM ET. BBL 3067690018.

Look up another building