Brooklyn · Block 1252 · Lot 87 · 11216

1528 Bedford Avenue

4 floors · 8 apartments · 10,544 sq ft · built 1931 · class C1 · owner of record: 1528 Bedford Ave Realty Corp

27open violations
$16,250ECB/OATH penalties owed
2HPD class C (immediately hazardous)
47dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-20 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4) · $16,250 owed
IssuedViolationHearingBalance
Apr 23, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 39139209K, FILE A CERTIFICATE OF CORRECTION
#39185803K
Jul 1, 2026
IN VIOLATION
$1,250
Apr 23, 2026Construction CLASS - 1
UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIOLATION 39139208Z, COMPLY WITH COMMISSIONER'S ORDER
#39185804M
Jul 1, 2026
IN VIOLATION
$2,500
Feb 21, 2025Construction CLASS - 1
WWOP OBSERVED AT CELLAR LEVEL 2 ROOMS CREATED WITH 3 PIECE BATHROOM WITH SHOWER AND KITCHEN FACILITIES WITH FULL HEIGHT PARTITION WALLS. NO PERMIT FOR PLUMBING, ELECTRIC AND CONSTRUCTION WORK., OBTAIN PERMIT
#39139208Z
May 7, 2025
DEFAULT
$0
Feb 21, 2025Construction CLASS - 1
OBSERVED AT CELLAR LEVEL OCCUPANCY CONTRARY TO THAT ALLOWED BY C/O IN CELLAR CREATED 2 ROOMS AND 3 PIECE BATHROOM AND NO SECOND MEANS OF EGRESS AND INSUFFICIENT LIGHT AND VENTILATION. VACATE CELLAR AREA., DISCO
#39139209K
May 7, 2025
DEFAULT
$12,500
DOB (6)
IssuedViolationStatus
Feb 21, 2025CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE IN APT#3A.
#25-00308
DOB VIOLATION - ACTIVE
Feb 21, 2025CONSTRUCTION
FAIL TO MAINTAIN-FIRE DMG TO APT 3A.FLRS @ APT 4A PARTIALLY RMVD APPRX 2'X5'-WATER DMG & PART CEIL CLPSD @ 1 THRU 4 FLS OF A LINE APTS UMPERMTD WALL OPENGS THRU INTER MASONRY WLS W/INADEQ HEADERS.OWNR RETAIN NYSPE-EVAL ENTIRE BLD-RPR DWGS TO BE PERMANENT RPRD UNDR PERMT STARTING BY 3/31/25.COMPLTD S
#FEU30801PN
DOB VIOLATION - ACTIVE
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#09227
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#10963
DOB VIOLATION - ACTIVE
Jan 20, 1999LOCAL LAW 10/81 - ELEVATOR

#02207
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#34790
DOB VIOLATION - ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Dec 31, 2009Boiler LBLVIO
Active
HPD (12) · C 2 · B 2 · A 6
IssuedClassViolationCorrect by
Mar 14, 2025I§ 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS 3A, 1ST APT FROM EAST AT SOUTH VACATE ORDER #259379—
Mar 14, 2025I§ 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS 4A, 1ST APT FROM EAST AT SOUTH VACATE ORDER #259379—
May 1, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 4, 2026
Jun 6, 2025A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Sep 9, 2025
Mar 13, 2025CApt 3A · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHMar 19, 2025
Mar 13, 2025CApt 4A · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 19, 2025
Apr 8, 2024A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 12, 2024
Mar 21, 2023A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jun 24, 2023
Feb 23, 2022A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.May 29, 2022
Apr 7, 2021A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 11, 2021
Sep 27, 2016B§ 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINIMUM OF 100 WATTS OF INCANDECSENT LIGHT REQUIRED. (LIGHT FIXTURE PRESENT)Nov 1, 2016
Dec 30, 2008BApt 1C · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTFeb 3, 2009

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 10:49 PM ET. BBL 3012520087.

Look up another building