4 floors · 7 apartments · 6,880 sq ft · built 1930 · class C7 · owner of record: United 1526 Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1139 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-23 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 10, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER; OBSERVED FACADE AT EXP 1 AND 2 IN STATE OF DISREPAIR. PARAPET WALL LEANING TOWARDS ROOF, LARGE STEP CRACKS RUNNING DOWN EXP 2 FACADE. CHIMNEY AT EXP 3 LEAN #39153338H | Oct 1, 2026 IN VIOLATION | $2,500 |
| Jul 10, 2025 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT OR INSTALLATION ON SITE - EXPIRED PERMIT; PERMIT B00753059 FOR SIDEWALK SHED IS EXPIRED SINCE 6/15/2023. NO NEW PERMITS HAVE BEEN OBTAINED FOR SHED AS OF 7/10/25., RENEW PERMIT #39153341Z | Oct 1, 2026 IN VIOLATION | $1,250 |
| Oct 11, 2023 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO22-01289,DATED 4/28/2022.RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'SREPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 10/11/2023,A #37025916L | Mar 13, 2024 DEFAULT | $12,500 |
| Nov 1, 2022 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO22-01289,DATED 5/2/2022.RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 11/1/2022,AN #37023419L | Jul 18, 2023 DEFAULT | $12,500 |
| Apr 28, 2022 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING & ALL PARTS THERE0F IN A CODE-COMPLIANT MANER. PARAPET WALL AT EXP 1 LEANING OVER ROOF, CREATING KICKOUT AT 4TH FL WINDOW LINTELS & DELAMINATION AT EXP 2 CORNER. STEP-CRACKING & SPA #39061315R | Aug 31, 2022 DEFAULT | $3,125 |
| May 17, 2016 | Boilers CLASS - 2 4B,5B,11C,15,16,32A,34B,48A,50,50A,50B,50C,50D,50E,50F,50G. AS PER CLASS 2 (B465) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT AS PER DOB RECORDS, SUBMIT A CURRENT B09 REPORT, CORRECT ALL VIOLAT #32076391X | Jul 11, 2016 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #13966 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #17672 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #17409 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 13) | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |