4 floors · 4,930 sq ft · built 1921 · class K2 · owner of record: 1429 Stanley Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 42 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 22, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO OBTAIN ENGINEERING REPORT AS STATED IN DOB VIOLATION VIO23-01743 DATED 5/30/2023 FOR ECB/OATH VIOLATION #37025552J. AS OF 4/22/2026, NO ENGINEERING REPORT HAS #39185674N | Apr 5, 2027 PENDING | $6,250 |
| Oct 11, 2023 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-01743, DATED 5/30/2023. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF 10/11/20 #37025552J | Mar 3, 2025 IN VIOLATION | $2,500 |
| May 30, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED A 1 STORY ADDITION CREATED ON TOP OF THE ROOF(VERTICAL EXTENTION) APPROXIMATELY 25 FEET WIDTH BY 30 FEET LENGTH 10 FEET HIGH ENCLOSURE. (2) WINDOWS CREATED AT EXPOSURE 1 AND (2) W #39087292Z | Aug 9, 2023 DEFAULT | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| May 30, 2023 | CONSTRUCTION VERTICAL EXTENTION. BUILT AN ENCLOSURE ON TOP OF ROOF AT ROOF LEVEL. #23-01743 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 16) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 2:32 PM ET. BBL 3014650038.