8 floors · 51,853 sq ft · built 1900 · class O6 · owner of record: 152 W 36 Owner Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-03-12 (Accepted). Agency page | Dec 31, 2026 in 48 days | 1 of 1 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 51,853 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 169 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 169 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $10,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 831 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1144 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 811). Agency page | Dec 31, 2031 in 1874 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 7, 2026 | Site Safety CLASS - 1 16 STORY ALT1 ACTIVE SITE,OBSERVED SUPPORTED SCAFFOLDING 245 FT ATTACHED TO SHORING ON PERSONNEL HOIST RUN AT EXP#1, ON TOP OF SIDEWALK SHED DECK AT EXP#1.UPON REQUEST TO CONTRACTOR FOR LOADS IMPOSED LETTER STA #39560317R | Dec 17, 2026 PENDING | $2,500 |
| Oct 7, 2026 | Cranes and Derricks CLASS - 2 16 STORY ALTERATION ACTIVE SITE, OBSERVED SUSPENDED SCAFFOLD INSTALLED ON ROOF AT EXP#2 & AT SETBACK ON 9 FLOOR EXP#3 AND ON 11 FL EXP#1 IN PLACE. UNDER PERMIT#M01388029, UPON REQUEST TO CONTRACTOR ONSITE FOR S #39560320H | Dec 17, 2026 PENDING | $2,500 |
| Oct 7, 2026 | Construction CLASS - 2 16 STORY ALT1 ACTIVE SITE, WORK CONTRARY TO SITE SAFETY PLAN/SSP. OBSERVED AT EXP#2,4/INADEQUATE PROTECTION OF ADJOINING PROPERTY.MISSING PLANKING ON TOP OF SCAFFOLD FOR MECHANICAL PROTECTION 3309.10/3309.13/33 #39560316P | Dec 17, 2026 PENDING | $1,250 |
| Oct 7, 2026 | Unknown CLASS - 2 16 STORY ALT1 ACTIVE SITE, OBSERVED EGRESS/INGRESS STAIRWAY PARTIALLY BLOCKED/OBSTRUCTED BY HOIST RUN SHORING ON 9 FL AT EXP#4. CREATING AN UNSAFE CONDITION/FIRE HAZARD TO WORKER'S ,VISITOR & FIRST RESPONDERS O #39560322L | Dec 17, 2026 PENDING | $2,500 |
| Oct 7, 2026 | Construction CLASS - 2 16 STORY ALTERATION ACTIVE SITE. OBSERVED SUSPENDED SCAFFOLD INSTALLED AT ROOF EXP#2/9 FL SETBACK EXP#3 & ON 11 FLOOR SETBACK AT EXP#1. UPON REQUEST TO CONTRACTOR FOR APPROVED PLANS AND OR A CD-5 STAMPED BY DOB #39560319K | Dec 17, 2026 PENDING | $1,250 |
| Oct 7, 2026 | Construction CLASS - 1 16 STORY ALT1 ACTIVE JOBSITE,ON 10 FL AT EXP#4 SHAFT OPENING APPROXIMATELY 3 FT WIDE OPENING/100 FT DOWN TO 1 FL WHERE WORKER'S WERE INSTALLING CMU BLOCK FRESH WET CEMENT. OBSERVED MISSING FALL PROTECTION/GUARD #39560315N | Dec 17, 2026 PENDING | $5,000 |
| Oct 7, 2026 | Construction CLASS - 2 16 STORY ALT ACTIVE SITE, OBSERVED SIDEWALK SHED IN PLACE AT EXP#1 INSTALLED CONTRARY TO PLANS.RED SCAFFOLDING ATTACHED TO HOIST RUN ON TOP OF SHED DECK. BENT 4' HORIZONTAL MEMBERS/BRACING AT EXP#1,2,AT EX#1,4 #39560321J | Dec 17, 2026 PENDING | $1,250 |
| Jul 22, 2026 | Construction CLASS - 1 RESPONDING TO A COMPLAINT OF INCIDENT THAT OCCURRED ON 07-21-2026 AT APPROXIMATELY 14:40, WHERE TWO LARGE SWING GATES FOR THE HOIST WERE NOT PROPERLY PINNED IN THE CLOSED POSITION, ALLOWING THEM TO SWING INTO T #39556959R | Mar 22, 2027 PENDING | $2,500 |
| Feb 28, 2023 | Construction CLASS - 2 27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100 FT OR MORE IN HEIGHT IN EXISTENCE ON #37025235X | Dec 5, 2024 IN VIOLATION | $3,409 |
| Mar 30, 2021 | Construction CLASS - 2 SEC. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BLDG 100 FEET OR MORE IN HEIG #37020987X | Oct 21, 2021 IN VIOLATION | $0 |
| Nov 15, 2019 | Construction CLASS - 2 27-929.1 A.C. 27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BUILDIN #37016192K | Jun 18, 2020 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 3, 2019 | SPRINKLER FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019 #NRF00963 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Aug 31, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 3, 2019 | Sprinklers FTF-SP-FINAL | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 7, 2026 | ECB | Site Safety: 16 STORY ALT1 ACTIVE SITE,OBSERVED SUPPORTED SCAFFOLDING 245 FT ATTACHED TO SHORING ON PERSONNEL HOIST RUN AT EXP#1, ON TOP OF SIDEWALK SHED DECK AT EXP#1.UPON REQUEST TO CONTRACTOR FOR LOADS IMPOSED LETTER STA | Open |
| Oct 7, 2026 | ECB | Cranes and Derricks: 16 STORY ALTERATION ACTIVE SITE, OBSERVED SUSPENDED SCAFFOLD INSTALLED ON ROOF AT EXP#2 & AT SETBACK ON 9 FLOOR EXP#3 AND ON 11 FL EXP#1 IN PLACE. UNDER PERMIT#M01388029, UPON REQUEST TO CONTRACTOR ONSITE FOR S | Open |
| Oct 7, 2026 | ECB | Construction: 16 STORY ALT1 ACTIVE SITE, WORK CONTRARY TO SITE SAFETY PLAN/SSP. OBSERVED AT EXP#2,4/INADEQUATE PROTECTION OF ADJOINING PROPERTY.MISSING PLANKING ON TOP OF SCAFFOLD FOR MECHANICAL PROTECTION 3309.10/3309.13/33 | Open |
| Oct 7, 2026 | ECB | Unknown: 16 STORY ALT1 ACTIVE SITE, OBSERVED EGRESS/INGRESS STAIRWAY PARTIALLY BLOCKED/OBSTRUCTED BY HOIST RUN SHORING ON 9 FL AT EXP#4. CREATING AN UNSAFE CONDITION/FIRE HAZARD TO WORKER'S ,VISITOR & FIRST RESPONDERS O | Open |
| Oct 7, 2026 | ECB | Construction: 16 STORY ALTERATION ACTIVE SITE. OBSERVED SUSPENDED SCAFFOLD INSTALLED AT ROOF EXP#2/9 FL SETBACK EXP#3 & ON 11 FLOOR SETBACK AT EXP#1. UPON REQUEST TO CONTRACTOR FOR APPROVED PLANS AND OR A CD-5 STAMPED BY DOB | Open |
| Oct 7, 2026 | ECB | Construction: 16 STORY ALT1 ACTIVE JOBSITE,ON 10 FL AT EXP#4 SHAFT OPENING APPROXIMATELY 3 FT WIDE OPENING/100 FT DOWN TO 1 FL WHERE WORKER'S WERE INSTALLING CMU BLOCK FRESH WET CEMENT. OBSERVED MISSING FALL PROTECTION/GUARD | Open |
| Oct 7, 2026 | ECB | Construction: 16 STORY ALT ACTIVE SITE, OBSERVED SIDEWALK SHED IN PLACE AT EXP#1 INSTALLED CONTRARY TO PLANS.RED SCAFFOLDING ATTACHED TO HOIST RUN ON TOP OF SHED DECK. BENT 4' HORIZONTAL MEMBERS/BRACING AT EXP#1,2,AT EX#1,4 | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Aug 31, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 22, 2026 | ECB | Unknown: RESPONDING TO A COMPLAINT OF AN INCIDENT WHERE TWO LARGE SWING GATES FOR THE HOIST SWING INTO THE SHAFT-WAY CAUSING THE HOIST TO STRUCK THE GATES, THE HOIST WAS REPAIRED AND RETURNED TO SERVICE. UPON REQUEST FO | Closed |
| Jul 22, 2026 | ECB | Construction: RESPONDING TO A COMPLAINT OF INCIDENT THAT OCCURRED ON 07-21-2026 AT APPROXIMATELY 14:40, WHERE TWO LARGE SWING GATES FOR THE HOIST WERE NOT PROPERLY PINNED IN THE CLOSED POSITION, ALLOWING THEM TO SWING INTO T | Open |
| Jul 22, 2026 | ECB | Construction: RESPONDING TO A COMPLAINT OF A INCIDENT THAT OCCURRED ON 07-21-2026 AT APPROXIMATELY 14:40, WHERE TWO LARGE SWING GATES FOR THE HOIST WERE NOT PROPERLY PINNED IN THE CLOSED POSITION, ALLOWING THEM TO SWING INTO | Closed |
| Jul 22, 2026 | ECB | Construction: RESPONDING TO A COMPLAINT OF AN INCIDENT WHERE 2 LARGE SWING GATES WHERE STRUCK BY THE HOIST IN THE SHAFT-WAY. INSPECTION REVEALED THAT THE GATE WHERE NOT PROPERLY PINNED IN THE LOCK POSITION AND THE GATES WERE | Closed |