22 floors · 98,847 sq ft · built 1929 · class O4 · owner of record: Heskel'S Paramount, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-07 (Accepted). Agency page | Dec 31, 2026 in 63 days | 1 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 98,847 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $1,254,500 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 846 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 862). Agency page | Dec 31, 2032 in 2255 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 9, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION, OBSERVED UNLAWFUL COMMERCIAL SIGN INSTALLED ON SIDEWALK SHED PARAPET AT THE CORNER OF EXP#1 & 2, CONTRARY TO CODE SPECIFICATIONS. #39553939X | Jul 16, 2026 IN VIOLATION | $2,500 |
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C AND 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #902456. AGG1: PRIOR NOV 37026113M UNDER #37036465P | Jul 16, 2026 IN VIOLATION | $3,125 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C AND 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#902456.AGG1:PRIOR NOV 37022118N UNDER 28 #37026113M | Apr 11, 2024 IN VIOLATION | $0 |
| Jun 8, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES.NOTE:AT THE TIME OF INSPECTION OBSERVED 1 CRACK WINDOW GLASS PANEL AT 3RD FLOOR LEVEL ABOVE THE SIDEWALK SHED AT EXPO#2 SOUTH ELEVATION.2 EXPO#2 SOUTH ELEV.V #35674267H | Aug 17, 2023 IN VIOLATION | $0 |
| Mar 7, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE & APPURTENANCES.OBSERVED ON EXP #2 OF BULKHEAD DETERIORATED MORTAR JOINTS EXP #3 HAS BULGING & DISPLACED STONES & DETERIORATED MORTAR JOINTS.EXP #4 LOOSE & CRACKED B #35670702P | May 11, 2023 IN VIOLATION | $0 |
| Mar 7, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE & APPURTENANCES.OBSERVED ON EXP #2 OF BULKHEAD DETERIORATED MORTAR JOINTS EXP #3 HAS BULGING & DISPLACED STONES & DETERIORATED MORTAR JOINTS.EXP #4 THERE IS LOOSE & #35670701N | May 11, 2023 IN VIOLATION | $0 |
| Mar 5, 2022 | Construction CLASS - 1 FAILUE TO MAINTAIN EXTERIOR BLDG FACADE & APPURTENANCES. 1)AT SOUTH ELEVATION,EXP#2 OBSERVED CRACKED BRICKS & DETERIORATED MORTAR JOINTS AT BULKHEAD FACING STRET(E. 32 ST). 2)AT WEST ELEVATION EXP#3 OBSERVED #35647599K | Jun 23, 2022 IN VIOLATION | $0 |
| Oct 8, 2021 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY28-302.5 FOR CONTROL#802456.FILE ACCEPTABLE REPORT #37022118N | Feb 24, 2022 IN VIOLATION | $0 |
| Mar 17, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. AT TIME OF INSPECTION OBSERVED EXPOSURE#1 BY THE EXPOSURE#4 CORNER JOINT DEGRADED MORTAR JOINT VERTICALLY ALSO BY THE FRONT ENTRANCE DOOR WALL BEA #35548634N | Jun 24, 2021 IN VIOLATION | $0 |
| Feb 13, 2020 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#802118. REMEDY: SUBMIT ACCEPTABLE REQUIRE #37018620R | Oct 1, 2020 IN VIOLATION | $0 |
| Sep 26, 2019 | Construction CLASS - 1 FAILURE TO TAKE IMMEDIATE SAFETY MEASURES WHERE REQUIRED TO PROTECT AND SECURE PUBLIC SAFETY,FROM DOCUMENTED UNSAFE FACADE AS PER 1RNCY-103-04.OBSERVED ON EXPOSURE 3 FACING WEST CONCRETE BEAMS ON EACH FLOOR WIT #35365870N | Mar 12, 2020 IN VIOLATION | $0 |
| Feb 16, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION OBSERVE EXPOSURE 1 EAST ELEVATION (MADISON AV) CRACK/MISSING BRICK AT 14 FLOOR AND CRACK/LOOSE/DAMAGE MASONRY FAC #35365388P | Apr 11, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 24, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: OBSERVED AT VIEW AREA EXPOSURE 1 EAST ELEVATION DEFECT AT WINDOW LINTEL AND SILL. 38TH FLOOR. EXPOSURE 2 DEFECTED WINDOW LINTELS. EXPOSURE4 BULGING AT PARAPET & VERTICAL CRACK NORTH EAST CORNER. ROOF: BULGING, CRACKS, SPALLING ERRODED JOIN #SR0502NS | DOB VIOLATION - ACTIVE |
| Dec 19, 2023 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO LARGE VERTICLE CORNER OF EXPO#4 SPALLING COATING ON STONE WORK&SPALLING STONE ON EXP#1GRD LEVELSPALLING/SPALLED BRICK WORK.BULGING BRICK WORK,DAMAGED @ FIRESTAIR ON EXP##3 ALL EXPO DAMAGED MORTAR JOINTS& BLDGE BRICK ON EXP#4 BULGING BRICK@ ROOF REMEDY IMMED.REPAIR/TAKE DO #SR10508DO | DOB VIOLATION - ACTIVE |
| Dec 19, 2023 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER LARGE VERTICLE CRACK AT THE CORNER OF EXPOSURE#4 SPALLED STONE ON EXPO#1@GROUND LEVEL SPALLED/SPALLING BRICK WORK BUILDING BRICK WORK DAMAGED MASONRY AT ALL EXPOSURESDAMAGED MORTAR JOINTS AND BULGING BRICK AT ROOF LEVEL STEP CRACK ANDSPALLED BR #SR10502DO | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00292 | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00293 | DOB VIOLATION - ACTIVE |
| Aug 24, 2023 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVE LARGE VERTICLE CRACK@CORNER OF EXPOSURES/AND 4 SPALLING COATING ON STONE WORK&SPALLED STONE ON EXP#1 @GROUND LEVEL.SPALLED/SPALLINGBRICK WORK BUILDING BRICK WORK,DAMAGED MASONRY @FIRE STAIRS ALL @ EXP#3DAMAGE MORTAR JOINTS&BULGING ON EX #SR10501XN | DOB VIOLATION - ACTIVE |
| May 19, 2023 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:EXPOSURE 1 EAST ELEVATION DAMAGE AT 1 FLR CORNER AND 2NDCRACK WINDOW PANE AT LOWER FLR EXPOSURE#2SPALL AT LOWER WINDOW SILLS AND AT 3 FLR DAMAGED AT LINTEL EXPPOSURE DAMAGED MASONRY@ EMERGENCY FIRE STAIRS.BULGING 4 FLR CORNER OF 1&4.REMEDY:MAINTA #SR0501NS | DOB VIOLATION - ACTIVE |
| May 11, 2021 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #909340 | DOB VIOLATION - ACTIVE |
| May 11, 2021 | HAZARDOUS CONDITION (FACADE) CYCLE 8C UNSAFE REPORT FILED #809339 | DOB VIOLATION - ACTIVE |
| Dec 26, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00037 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| May 11, 2021 | Facades FISPHAZ CYCLE 8C UNSAFE REPORT FILED | Active |
| May 11, 2021 | Facades FISPHAZ CYCLE 9C UNSAFE REPORT FILED | Active |
| Dec 26, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
None open.