Manhattan · Block 802 · Lot 8 · 10001

151 West 26 Street

12 floors · 179,131 sq ft · built 1911 · class O6 · owner of record: Abner Properties Co

10open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
173dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 52 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 179,131 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 173 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 173 days
Annual filing
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $298,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 835 days
Filing window not open yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1148 days
Next cycle year 2029
Energy audit and retro-commissioning (2032) Likely applies
Local Law 87 · Calendar year 2032
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 802). Agency page

Dec 31, 2032
in 2244 days
Next due 2032
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-19 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (7)
IssuedViolationHearingBalance
Jun 20, 2012Construction CLASS - 2
ALTERED/CHANGED BLDG OCCUPIED W/O A VALID CERT OF OCCUPANCY AS PER 28-118.3.1-28.118.32.BLDG ALTERED UNDER JOB#120102003 NOW @ TIME OF INSPEC ENTIRE BLDG IS OCCUPIED W/O VALID CERT OF OCCUPANCY.REM:OBTAINED VAL
#34938261R
Aug 9, 2012
IN VIOLATION
$0
Sep 10, 2009Unknown CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS. NOTED: RESPONDENT FAILED TO COMPLY WITH THE COMMISSIONER'S ORDER TO CORRECTION PURSUANT TO 28-204.
#34807649N
Dec 17, 2009
DEFAULT
$0
Jul 16, 2009Construction CLASS - 2
ALTER BUILDING OCCUPIED W/O A VALID C OF O NOTED: INSPECTION OF 8 OUT OF 12 STORIES REVEALED COMMERCIAL OCCUPANCY AS CITED IN PRIOR E.C.B:34699058X,34650062L,34642225R; INCLUDING MEDIA MARKETING FIRM; THEATRE A
#34777169J
Sep 10, 2009
STIPULATION/IN-VIO
$0
Apr 21, 2009Construction CLASS - 1
ALT/CHANGED BLDG OCCUPIED W/O VALID C OF O PER 28-118.3.1-28-118.3.2 NOTED: EXISTING C OF O 44258 INDICATES FLOORS 3RD TO 12TH AS FACTORY, OFFICES AND SHOW ROOMS ON EACH STORY. EXISTING CONDITIONS ON THE 7TH
#34775340L
Jun 11, 2009
DEFAULT
$0
Aug 24, 2008Construction CLASS - 2
ALTERED/ CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28.118.3.1 NOTE: ALTERED BLDG UNDER JOB # 101858116 OCCUPIED ONB 5TH & 6TH FL (CHELSEA STUDIOS). WITHOUT A VALID "CO" REM: OBTI
#34699058X
Oct 16, 2008
DEFAULT
$0
May 22, 2008Construction Non-Hazardous
ALTERED BUILDING OCCUPIED W/O A VALID CERTIFICATE OF OCCUPANCY UNDER ALT#101858116 6TH FLR IS OCCUPIED AS FILM STUDIOS. ALSO OCCUPANCY CONTRARY AT ALL OTHER FLRS CONTRARY TO C/O #44258. REMEDY: OBTAIN A VALID
#34650062L
Apr 23, 2009
DEFAULT
$0
Apr 1, 2008Construction Non-Hazardous
OCCUPANCY CONTRARY TO THAT ALLOWE BY THE C OF O #44258,C OF O STATES BLDG IS TO OCCUPIED AS FACTORY SHOWS ROOMS & OFFICES BLDG NOW OCCUPIED AS FLOORS 12,11,9,8,7,3,2 AS OFFICES.FLOORS 6,5 STUDIOS FLOOR 4 TWO FA
#34642225R
Apr 23, 2009
DEFAULT
$0
DOB (0)

None open.

DOB NOW Safety (3)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 9, 2026, 1:31 PM ET. BBL 1008020008.

Look up another building