Bronx · Block 2859 · Lot 77 · 10452

1509 Jerome Avenue

4 floors · 139,403 sq ft · built 2010 · class W1 · owner of record: Nyc Department Of Education

48open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
65dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 65 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-06 (Accepted). Agency page

Dec 31, 2026
in 65 days
1 of 3 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 139,403 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 186 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 186 days
Annual filing
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2859). Agency page

Dec 31, 2029
in 1161 days
Next due 2029

Open violations

ECB / OATH (11)
IssuedViolationHearingBalance
Jun 5, 2026Elevators CLASS - 2
CLASS 2 ITEM: STORAGE OF MATERIALS OBSERVED IN ELEVATOR MACHINE ROOM. REMOVE ALL NON-ELEVATOR RELATED ITEMS AND MAINTAIN MACHINE ROOM FREE OF STORAGE, IN VIOLATION OF ASME A17.1-2013 2.7.1.2 AND 8.6.1.2.1
#39191432L
Jun 26, 2026
POP/IN-VIO
$0
Jun 5, 2026Elevators CLASS - 2
CLASS 2 ITEM: OIL LEAKAGE OBSERVED AT HYDRAULIC CONTROL VALVE ASSEMBLY. REPAIR LEAK AND MAINTAIN EQUIPMENT IN PROPER OPERATING CONDITION, IN VIOLATION OF ASME A17.1-2013 8.6.1.2.1
#39191433N
Jun 26, 2026
POP/IN-VIO
$0
Apr 2, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIORCLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY WHEN TESTED AT 4TH FLR-RM #432. 3RD FLR-RM #329. REMEDY: REPAIR AND/OR REPLACE.
#35722441H
May 15, 2026
POP/IN-VIO
$0
Apr 2, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: IN THE BASEMENT NEAR RM #B17 EMERGENCY EXIT SIGN DOES NOT WORK.
#35722442J
May 15, 2026
POP/IN-VIO
$0
Aug 15, 2025Boilers CLASS - 2
FOUND VIESSMAN GAS FIRED BOILER MODEL# CT3-28 AT MAXIMUM WORKING PRESSURE AND ALL 3 RELIEF VALVES LEAKING, CORRECT VIOLATING CONDITION.
#39157238Z
Aug 29, 2025
POP/IN-VIO
$0
May 2, 2025Elevators CLASS - 1
RESPONDING TO A DOE SWEEP COMPLAINT, UPON INSPECTION , CLASS 1 VIOLATION ISSUED FOR. NO DLM INSTALLED IN THE CONTROLLER. REMEDY. FILE APPLICATION WITH NYCDOB, THEN INSTALL DLM.
#39146845R
May 9, 2025
POP/IN-VIO
$0
Apr 12, 2021Elevators CLASS - 1
NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY; FILE APPLICATION, INSTALL DLM A
#39039225M
Apr 15, 2021
POP/IN-VIO
$0
Apr 12, 2021Elevators CLASS - 1
NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY; FILE APPLICATION, INSTALL DLM A
#39039224K
Apr 15, 2021
POP/IN-VIO
$0
Apr 12, 2021Elevators CLASS - 1
NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY; FILE APPLICATION, INSTALL DLM A
#39039222R
Apr 15, 2021
POP/IN-VIO
$0
Apr 12, 2021Elevators CLASS - 1
NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY; FILE APPLICATION, INSTALL DLM A
#39039223Z
Apr 15, 2021
POP/IN-VIO
$0
Oct 22, 2002Construction Non-Hazardous
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY.C OF O #50367. FROM LEGAL USE:MOTOR VEHICLE REPAIR TO ILLEGAL USE:BODY REPAIR LOCATION:STREET LEVEL DISCONTINUE ILLEGAL USE.OR MEND CERTIFICATE
#34368577L
Mar 7, 2003
WRITTEN OFF
$0
DOB (2)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#06176
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#30229
DOB VIOLATION - ACTIVE
DOB NOW Safety (35)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
May 20, 2019Elevators EVCAT5
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 11:51 AM ET. BBL 2028590077.

Look up another building