| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-12 (Accepted). Agency page | Dec 31, 2026 in 47 days | 2 of 2 without an accepted 2026 report yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 17, 1995 | Construction Non-Hazardous WORK WITHOUT A PERMIT. REMOVING INTER-PARTITION THROUGHOUT 1ST AND SECOND STORY. REPLACING WITH NEW PARTITION AND PLUMBING. REMEDY: OBTAIN A PERMIT IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITI #34120986N | Jun 9, 1995 WRITTEN OFF | $0 |
| Aug 14, 1990 | Construction Hazardous FAILURE TO SAFE GUARD PUBLIC AN DPROPERTY DURING CONSTRUCTION OPERATIONS DEFECT NOTED NEWLY INSTALLED STAIRWELL AT CENTER OF OCCUPIED SECOND LEVEL HAS NO GUARDRAIL OR RAILING. REMEDY DISCONTINUED ILLEGAL OCCUPA #34045381N | Sep 28, 1990 WRITTEN OFF | $0 |
| Nov 3, 1989 | Construction Non-Hazardous OCCUPANCY CONTRARY TO THAT ALLOWED BY BUILDING DEPARTMENT RECORDS. REMEDY: OBTAIN A CERTIFICATE OF OCCPANCY LEGALIZING CURRENT USE OR DISCONTINUE ILLEGAL OCCPANCY FORTHWITH. #34029390P | Dec 15, 1989 WRITTEN OFF | $0 |
| Nov 3, 1989 | Construction Hazardous FAILURE TO SAFEGUARD PUBLIC AND PROPERTY DURING CONSTRUCTION OPERATIONNEWLY INSTALLED STAIRWELL AT THE CENTER OF OCCUPIED SECOND LEVEL HAS NO GUARDRAIL OR RAILING. #34029391R | Dec 15, 1989 WRITTEN OFF | $0 |
| Oct 4, 1989 | Construction Non-Hazardous WORK WITHOUT A PERMIT. REMOVING INTERIOR PARTITONS THROUGHOUT 1ST AND 2ND STORY REPLACING WITH NEW PARTITIONS NEW PLUMBING. REMEDY: FILE PLAN AND OBTAIN APPROVAL AND PERMITS #34029311H | Nov 24, 1989 WRITTEN OFF | $0 |
| Jun 6, 1989 | Construction Unknown WORK WITHOUT A PERMIT WORK NOTED: 1. REMOVING INTERIOR PARTITION THROUGHOUT 1ST +2ND STY. AND REPLACING IT RENEW PARTITION, NEW PLUMBING. REMEDY: FILE PLAN AND OBTAIN APPROVED AND PERMIT. #34022429L | Jul 21, 1989 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #06325 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #06326 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #05755 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #05756 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #07510 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #08276 | DOB VIOLATION - ACTIVE |
| May 6, 1999 | CONSTRUCTION #9AA4 | VIOLATION WORK W/OUT PMT HAZARDOUS - ACTIVE |
| Apr 13, 1993 | CONSTRUCTION #12W05 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |