Brooklyn · Block 7320 · Lot 48 · 11229

1503 Avenue U

3 floors · 2 apartments · 3,100 sq ft · built 1925 · class S2 · owner of record: Vef Llc

12open violations
$6,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
69dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2021-04-06 (Accepted). Agency page

Dec 31, 2026
in 69 days
1 of 1 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 313 days
Required only if the owner doesn't live there
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 434 days
Next cycle year 2027

Open violations

ECB / OATH (2) · $6,250 owed
IssuedViolationHearingBalance
Jun 1, 2023Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS IN REFERENCE TO VIOLATION #039070233H. CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFIC
#39087520L
Aug 9, 2023
DEFAULT
$3,125
Sep 16, 2022Boilers CLASS - 2
NO CHIMNEY CLEAN OUT, NO SHUT OFF AND ANTISYPHON VALVE ON OIL SUPPLY.THE NEW OIL SUPPLY LINE DOES NOT CONFORM TO CHAPTER 13 OF THE NYC MECHANICAL CODE. CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE
#39070233H
Jan 18, 2023
DEFAULT
$3,125
DOB (3)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#14080
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#12859
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#14427
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
HPD (4) · C 0 · B 2 · A 2
IssuedClassViolationCorrect by
May 21, 2018AApt 3FLR · § 27-2005 ADMIN. CODE: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 3FLR, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTAug 24, 2018
Jul 8, 2008BSECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT - COLD WATER SUPPLY PIPE TO WATER CLOSET TANK IN BATHROOM, 3RD STY. APT.Aug 12, 2008
Jul 8, 2008BSECTION 27-2026 ADMIN. CODE: REPAIR BY CLOSING SO AS TO BE GAS TIGHT ALL OPENINGS IN THE - WASTE PIPE OF WASH BASIN IN BATHROOM, 3RD STY. APT.Aug 12, 2008
Jul 8, 2008ASECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT - WALLS AND CEILING KITCHEN AND FRONT SOUTH 3RD STY APT (ROOM).Oct 11, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 1:15 AM ET. BBL 3073200048.

Look up another building