Manhattan · Block 996 · Lot 1 · 10036

1500 Broadway

33 floors · 493,107 sq ft · built 1972 · class O4 · owner of record: Zapco 1500 Investment, L.P.

62open violations
$99,380ECB/OATH penalties owed
0HPD class C (immediately hazardous)
69dto Energy audit and retro-commissioning (2026)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 996). Agency page

Dec 31, 2026
in 69 days
Due this year
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $465,150 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 121 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 493,107 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1165 days
Next cycle year 2029

Open violations

ECB / OATH (18) · $99,380 owed
IssuedViolationHearingBalance
Aug 4, 2026Unknown CLASS - 2
DURING THE INSPECTION OF FACADE ALTERATION OF 33 STORY BUILDING OBSERVED SWS AT EXPOSURE 1 WAS USED AS STORAGE FOR EQUIPMENT( PORTABLE TOILET) & NOT IN SWS DRAWING. THIS IMPROPER LOADING PLACES EXCESSIVE STRESS
#39557590K
Dec 3, 2026
PENDING
$2,500
Aug 4, 2026Construction CLASS - 2
DURING THE INSPECTION OF ALTERATION 33 STORY BUILDING OBSERVED AT EXP# 1 & 4 COMMERCIAL ADVERTISEMENT ON THE SWS PARAPET. CONTRARY TO THE NYC ADMINISTRATIVE CODE 3301.9.1 AND 3301.9.2. WHICH PROHIBIT COMMERCIAL
#39557589N
Dec 3, 2026
PENDING
$2,500
Jun 11, 2026Construction CLASS - 2
FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39086543J ISSUED ON 05-17-2023 FOR FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES., FILE A CERTIFICATE OF CORRECTION
#39192240L
Aug 20, 2026
DEFAULT
$6,250
Jun 11, 2026Construction CLASS - 1
FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #37025571P ISSUED ON 10-11-2023 TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-01447,DATED 5/17/2023.RESPONDENT WAS REQUIRED TO SUBMIT AN
#39192239Y
Aug 20, 2026
DEFAULT
$25,000
Apr 20, 2026Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #903035. REMEDY: FILE ACCEPTABLE REPORT.
#37036731Z
Jul 30, 2026
IN VIOLATION
$1,250
May 27, 2025Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED TWO SUSPENDED SCAFFOLDS INSTALLED AT EXP. 3. UPON INSPECTING NOTICE DISCREPANCIES THAT DOES NOT CONFORM WITH APPROVED DRAWINGS. HOIST CAPACITY IS 1200 LBS. INSTEAD OF 1000 AS PER
#39540658R
Jul 31, 2025
IN VIOLATION
$1,250
May 27, 2025Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED 2 SUSPENDED SCAFFOLDS INSTALLED ON SITE. UPON REQUESTING PULL TEST IT WAS NOT PROVIDED AND WAS INFORM ONE ANCHOR FAIL. ONE SCAFFOLD IS INSTALLED AND READY TO USE USING ONLY ANCHOR
#39540659Z
Jul 31, 2025
IN VIOLATION
$1,250
May 27, 2025Construction CLASS - 1
AT TIME OF INSPECTION OBSERVED SUSPENDED SCAFFOLDS INSTALLED AT EXPOSURE 3. AT EXPOSURE 2 AND 4 OBSERVED SIDEWALK SHED INSTALLED. SWS END AT PROPERTY LINE ON BOTH EXPOSURES NO EXTENSION PROVIDED. DRAWINGS PROVI
#39540660X
Jul 31, 2025
IN VIOLATION
$10,000
Jan 29, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35675192R ISSUED ON 09/22/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT
#37032914N
Apr 7, 2026
IN VIOLATION
$1,250
Jun 17, 2024Construction CLASS - 2
A.C. 27-929 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BUILDING 100 FEET OR MORE IN HEIGHT IN EXIS
#37028829R
Sep 12, 2024
DEFAULT
$10,000
Oct 11, 2023Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-01447,DATED 5/17/2023.RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'SREPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 10/11/2023,A
#37025571P
Oct 10, 2024
IN VIOLATION
$2,500
Sep 22, 2023Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTE: OBSERVED (I) EXPO #1 SOUTH ELEVATION DEFECTED METAL AND OPEN JOINTS AT 2ND FLOOR LEVEL. (II) AT ROOT AREA ON BULKHEAD LOOSE BRICK AND CRACK OVER DOOR
#35675192R
Dec 7, 2023
STIPULATION/IN-VIO
$630
Jul 17, 2023Construction CLASS - 1
FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER'S: OWNER/RESPONDENT TO COMPLY WITH PREVIOUS VIOLATION #35670928H ISSUED ON 05/18/2023. AS OF DATE OF INSPECTION 07/17/2023 SAME CONDITIONS EXIST. NEW CONDITIO
#35671090H
May 2, 2024
IN VIOLATION
$2,500
May 18, 2023Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTE:ASOF TODAY TIME OF INSPECTION 05-18-23 OBSERVED AT EX#2(WEST EL)(7TH AVE)DEFECT GLASS WINDOW PANEL AT 15TH FLOOR,WITH NO ANY SAFETY MEASURES U
#35670928H
Dec 7, 2023
IN VIOLATION
$2,500
May 17, 2023Construction CLASS - 1
OBSERVED APPROX. 4'-0 C 3'-0" SECTION OF A GLASS PANEL MISSING ON 15TH FLOOR EXTERIOR AT EXPO # 01 AND MISSING GLASS PANEL FELL ON TO 7TH FLOOR SETBACK AT SAME EXPOSURE. OBSERVED EVIDENCE OF SHATTERED GLASS PI
#39086543J
Dec 7, 2023
IN VIOLATION
$12,500
Feb 28, 2023Construction CLASS - 2
27-929.1 FAILURE TO COMPETE THE INSTALLATION OF A FULL SYSTEM OF AUTO MATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE
#37025412H
Jun 29, 2023
DEFAULT
$10,000
Dec 2, 2022Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#903035.REM:SUBMIT ACCEPTABLE REQUIRED T
#37024229P
Aug 17, 2023
IN VIOLATION
$1,250
Nov 15, 2019Construction CLASS - 2
AC 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE SPRINKLER REPORT PREPARED BY A REGISTERD DESIGN PROFESSIONAL BY JULY 1, 2019, IN AN OFFICE BUILDING 100 FEET OR
#37016422R
Mar 3, 2022
DEFAULT
$6,250
DOB (23)
IssuedViolationStatus
May 7, 2025FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
#00016
DOB VIOLATION - ACTIVE
Feb 19, 2025HAZARDOUS CONDITION (FACADE)
CYCLE 9A UNSAFE REPORT FILED
#912044
DOB VIOLATION - ACTIVE
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2400232
DOB VIOLATION - ACTIVE
Jun 23, 2024FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
#00846
DOB VIOLATION - ACTIVE
Dec 1, 2023FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2300248
DOB VIOLATION - ACTIVE
Oct 4, 2023FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00332
DOB VIOLATION - ACTIVE
Oct 4, 2023FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00333
DOB VIOLATION - ACTIVE
May 18, 2023CONSTRUCTION
EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE OBSERVED@ EX#2(WEST ELEV) (7TH AVE)DEFECT GLASS WINDOW PANEL AT 15TH FLOOR,ALSO BASED ON THE INCIDENT HAPPENED 05/17/23 OBSER.BROKEN GLASS PNL@16TH FL@EXP#2(W.EL 7TH AVE)&FELL ON THE 7TH SETBACK,OBSER.SHATTERED GLASS PIECES 7TH FL SETBACK.REMEDY:IMMED PRO
#LLFA01GM
DOB VIOLATION - ACTIVE
May 17, 2023CONSTRUCTION
OBSERVED APPROX. 4'-0 3'-0" SECTION OF A GLASS PANEL MISSING ON 15TH FLOOR EXTERIOR AT EXPO # 01 AND MISSING GLASS PANEL FELL ON TO 7TH FLOOR SETBACK AT SAME EXPOSURE. OBSERVED EVIDENCE OF SHATTERED GLASS PIECES AND INSULATION ON 7TH FLOOR SETBACK. REMAINING FACADE GLASS PANELS STABILITY UNKNOWN.
#23-01447
DOB VIOLATION - ACTIVE
Apr 22, 2023FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
#00268
DOB VIOLATION - ACTIVE
Aug 21, 2022FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)
#00693
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00291
DOB VIOLATION - ACTIVE
Jun 20, 2021FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)
#00149
DOB VIOLATION - ACTIVE
Apr 29, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2000642
DOB VIOLATION - ACTIVE
Jun 29, 2020FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019)
#00113
DOB VIOLATION - ACTIVE
Sep 3, 2019SPRINKLER
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
#NRF00288
DOB VIOLATION - ACTIVE
Mar 18, 2019FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2018)
#00329
DOB VIOLATION - ACTIVE
Mar 27, 2018FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017)
#00009
DOB VIOLATION - ACTIVE
Feb 16, 2017FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2016
#00047
DOB VIOLATION - ACTIVE
May 27, 2009ELEVATOR

#294777/9011
DOB VIOLATION - ACTIVE
Oct 18, 2007ELEVATOR

#9444/222302
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#00808
DOB VIOLATION - ACTIVE
May 11, 1992CONSTRUCTION

#C4AM04
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (25)
IssuedViolationStatus
Dec 8, 2025GHG Emissions - LL97 FTF-EN-LL97320
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
May 7, 2025Facades FISPFCS
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
Active
Feb 19, 2025Facades FISPHAZ
CYCLE 9A UNSAFE REPORT FILED
Active
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
Jun 23, 2024Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Dec 1, 2023Energy Grade - LL33 FTP-EN-EGRDEA
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 4, 2023AEUHAZ FTC-AEU-HAZ
Active
Oct 4, 2023AEUHAZ FTC-AEU-HAZ
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
Apr 22, 2023Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Aug 21, 2022Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Jun 20, 2021Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Apr 29, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
Jun 29, 2020Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Sep 3, 2019Sprinklers FTF-SP-FINAL
Active
Mar 18, 2019Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Mar 27, 2018Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Feb 16, 2017Retro-Commissioning - LL87 FTF-EN-EARCX
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 4, 2026ECBUnknown: DURING THE INSPECTION OF FACADE ALTERATION OF 33 STORY BUILDING OBSERVED SWS AT EXPOSURE 1 WAS USED AS STORAGE FOR EQUIPMENT( PORTABLE TOILET) & NOT IN SWS DRAWING. THIS IMPROPER LOADING PLACES EXCESSIVE STRESSOpen
Aug 4, 2026ECBConstruction: DURING THE INSPECTION OF ALTERATION 33 STORY BUILDING OBSERVED AT EXP# 1 & 4 COMMERCIAL ADVERTISEMENT ON THE SWS PARAPET. CONTRARY TO THE NYC ADMINISTRATIVE CODE 3301.9.1 AND 3301.9.2. WHICH PROHIBIT COMMERCIALOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 3:48 AM ET. BBL 1009960001.

Look up another building