7 floors · 20,250 sq ft · built 1920 · class O6 · owner of record: S & R Properties Ofnew York Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $38,750 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 465 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1144 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-05 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 29, 2022 | Construction CLASS - 2 NO LIGHTING UNDER SIDEWALK SHED. #39506971Y | Oct 15, 2026 DEFAULT | $2,430 |
| Mar 18, 2019 | Construction CLASS - 2 REQUIRED SIGNS.NOTE:AT THE TIME OF MY INSPECTION.I OBSERVED SIDEWALK SHED ERECTED AT EXPOSURE ONE.I ALSO OBSERVED THAT THERE WERE NO INFORMATION PANEL POSTED ON PARAPET SHED.REQUIRED INFORMATION PANELS SHALL BE #35403640M | Oct 31, 2019 IN VIOLATION | $0 |
| Mar 18, 2019 | Construction CLASS - 2 SHED EXTEND.NOTE:AT THE TIME OF INSPECTION.I OBSERVED A SIDEWALK SHED ERECTED AT EXPOSURE ONE.I ALSO IBSERVED THA THE SHED WAS NOT EXTENDED BEYOUND THE PROPERTY LINES.THE DECKING OF SIDEWALK SHED SHELL BE AN AD #35403639P | Oct 31, 2019 IN VIOLATION | $0 |
| Mar 4, 2019 | Construction CLASS - 2 WORK W/O A PERMIT ILLEGAL WORK NOTED AT TIME OF INSPECTION OBSERVED A 2SIDED ILLUMINATED SIGN 4 STORIES TALL 3'IN WIDTH, PROJECTING 8'FROM EXP1 AT FACADE WORDING ON SIGN AS FOLLOWS LE-MARAIS BAR AND GRILL.REV #35351470R | Sep 26, 2019 ADMIT/IN-VIO | $0 |
| Jul 14, 2015 | Construction CLASS - 2 WORK W/O A PERMIT:ILLEGAL WORK NOTED: ERECTED/INSTALLED: 1-3RD TO 6TH FLR LEVEL.BLDG FRONT FACADE ILLUMINATED DOUBLE FACE PROJECTING SIGN WORDING "HARRIS BAR & GRILL"; 2-1ST FLR LEVEL ILLUMINAED DOUBLE FACE #35138885X | Nov 12, 2015 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01998 | DOB VIOLATION - ACTIVE |
| Sep 30, 2021 | ELEVATOR #9027/707812 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #01660 | DOB VIOLATION - ACTIVE |
| Aug 22, 2019 | ELEVATOR #9027/660346 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #02035 | DOB VIOLATION - ACTIVE |
| Dec 1, 2016 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST #00585 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #02253 | DOB VIOLATION - ACTIVE |
| Aug 19, 2016 | ELEVATOR #9027/585213 | DOB VIOLATION - ACTIVE |
| Jun 1, 2016 | ELEVATOR #EVCAT580600 | DOB VIOLATION - ACTIVE |
| Aug 30, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 #00464 | DOB VIOLATION - ACTIVE |
| Mar 31, 2008 | EMERGENCY POWER #NRF00539 | DOB VIOLATION - ACTIVE |
| Nov 30, 2001 | CONSTRUCTION #MTF04RNS | DOB VIOLATION - ACTIVE |
| Nov 30, 2001 | CONSTRUCTION #MTF03RNS | DOB VIOLATION - ACTIVE |
| May 29, 1991 | CONSTRUCTION #C3AL01 | VIOLATION UNSERVED ECB-ACTIVE |
| Apr 19, 1991 | PLUMBING #071 | DOB VIOLATION - ACTIVE |
| Mar 1, 1991 | CONSTRUCTION #CMG02 | VIOLATION UNSERVED ECB-ACTIVE |
| May 24, 1989 | ELEVATOR (7) TEST AND TOE. (47) PROVIDE WALL AROUND ALL ELEVATOR EQUIPMENT (52) PROVIDE FLOOR COVERING IN ELEVATOR. (53) REMOVE WATER PIPE MOTOR ON FILE FOR SAME #1176B?)@ | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Dec 1, 2016 | Elevators EVCAT1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Jun 1, 2016 | Elevators E | Active |
| Aug 30, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Active |
| Mar 31, 2008 | Emergency Power FTF-EL-ENRF | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 5, 2025 | B | Apt 5F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 1O SQUARE FEET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 17806340 ISSUED 05-APR-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE | Sep 9, 2025 |
| Mar 24, 2025 | B | Apt 5F · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 28, 2025 |
| Jan 21, 2025 | B | Apt 5F · § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT WASH BASIN IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 25, 2025 |
| Jan 8, 2025 | B | Apt 5F · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 12, 2025 |
| Oct 28, 2024 | B | Apt 5F · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 2, 2024 |
| Jul 22, 2024 | B | Apt 5F · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH/BASIN IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 26, 2024 |
| Jan 2, 2024 | C | Apt 5F · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 16, 2024 |
| Sep 26, 2022 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Dec 30, 2022 |
| Sep 26, 2022 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Dec 30, 2022 |
| Aug 30, 2021 | B | Apt 5F · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 4, 2021 |
| Aug 30, 2021 | B | Apt 5F · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 4, 2021 |
| Aug 30, 2021 | A | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 7th STORY | Dec 3, 2021 |
| Aug 30, 2021 | A | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 7th STORY | Dec 3, 2021 |
| May 13, 2021 | B | § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN AT COMMUNITY BATHROOM, 5th STORY | Jun 17, 2021 |
| Apr 27, 2021 | B | § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM AT PUBLIC HALL, 5th STORY | Jun 1, 2021 |
| Apr 29, 2019 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Aug 2, 2019 |
| Jul 20, 2018 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Oct 23, 2018 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 10:56 PM ET. BBL 1009980055.