4 floors · 1 apartments · 79,726 sq ft · built 1920 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 79,726 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 431). Agency page | Dec 31, 2031 in 1870 days | Next due 2031 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 7, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:A SECTION OF THE CEILING IN THE GAS METER ROOM IS BROKEN OPEN TO MAKE A REPAIR.THE REPAIR IS COMPLETED;HOWEVER,THE CEILING REMAINS OPEN.THE CEILING NE #35734595Z | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 7, 2026 | Construction CLASS - 2 REISSUE#35693269P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT THE STAIRWAYS THROUGHOUT THE SCHOOL,THERE ARE SEVERAL BROKEN OR CRACKED GLASS PANELS IN THE STAIR PARTITIONS.REM:REPAIR/REPLACE. #35734592N | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 7, 2026 | Construction CLASS - 2 REISSUE#35693267L FAILURE TO MAINTAIN BUILDING IN CODE COMPIANT MANNERNOTED:AT SEVERAL AREAS OF CELLAR,THERE IS WATER PENETRATION INCLUDING BOILER RM,GAS METER ROOM AND ELECTRIC METER ROOM.REM:REPAIR AND SEAL A #35734593P | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 26, 2025 | Construction CLASS - 2 RE-ISSUE #35688665K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: THERE ARE SEVERAL MISSING OR BROKEN GLASS PANELS AT THE STAIRWAYS THROUGHOUT THE SCHOOL. REMEDY: REPAIR/REPLACE. #35693269P | Sep 10, 2025 POP/IN-VIO | $0 |
| Aug 26, 2025 | Construction CLASS - 2 RE-ISSUE #35692351J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT CELLAR LEVEL WATER PENETRATION IN SEVERAL AREAS INCLUDING ELECTRICAL EQUIP. RM, BOILER RM. REMEDY: REPAIR/REPLACE. #35693267L | Sep 10, 2025 POP/IN-VIO | $0 |
| Aug 26, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION #35325076J. REMEDY: COMPLY WITH COMMISSIONER'S ORDER. #35693268N | Sep 10, 2025 POP/IN-VIO | $0 |
| Sep 12, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT STAIRWELLS THROUGHOUT BUILDING GLASS PANDO CRACK AND MISSING APPROX 25 STAIR G BULKHEAD CRACKS THROUGHOUT ENTIRE SCHOOL STAIRWELLS AND HALLWAY CRACKS IN #35688665K | Jan 23, 2025 POP/IN-VIO | $0 |
| Sep 12, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT CELLAR WATER PENETRATION IN ELECTRICAL BOILER ROOM AND FOUNDATION ALSO ALLAROUND BOTTOM OF FOUNDATION AND SPALLING BRICKS AND OIL TANK AND GAS R #35692351J | Jan 23, 2025 POP/IN-VIO | $0 |
| Mar 14, 2018 | Construction CLASS - 2 WORK WITHOUT A PERMIT. NOTED: AT CELLAR ERECTED (1) STORAGE ROOM WITH 10' X 8' 3/4 PLYWOOD, 2 X 4 WOOD STUD FRAMED COMBUSTABLE MATERIALS WITH LOCKING DEVICE. ALSO, ERECTED 3/4" PLYWOOD AND 2 X 4 WOOD FRAME STRU #35325076J | Jul 26, 2018 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 7, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:A SECTION OF THE CEILING IN THE GAS METER ROOM IS BROKEN OPEN TO MAKE A REPAIR.THE REPAIR IS COMPLETED;HOWEVER,THE CEILING REMAINS OPEN.THE CEILING NE | Open |
| Aug 7, 2026 | ECB | Construction: REISSUE#35693269P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT THE STAIRWAYS THROUGHOUT THE SCHOOL,THERE ARE SEVERAL BROKEN OR CRACKED GLASS PANELS IN THE STAIR PARTITIONS.REM:REPAIR/REPLACE. | Open |
| Aug 7, 2026 | ECB | Construction: REISSUE#35693267L FAILURE TO MAINTAIN BUILDING IN CODE COMPIANT MANNERNOTED:AT SEVERAL AREAS OF CELLAR,THERE IS WATER PENETRATION INCLUDING BOILER RM,GAS METER ROOM AND ELECTRIC METER ROOM.REM:REPAIR AND SEAL A | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 6:05 PM ET. BBL 1004310014.