5 floors · 16,595 sq ft · built 1920 · class N2 · owner of record: L & S Properties 3 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 409 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-30 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 17, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION OBSERVED OBSTRUCTED SPRINKLER HEADS AND LACK OF SPRINKLER COVERAGE THIS IS CONTRARY TO BC903.3.3, WHICH REQUIRES AUTOMATIC SPRINKLERS TO BE INSTALLED WITH DUE REGARD TO OBSTRUCTIONS TH #39200752M | Dec 3, 2026 PENDING | $2,500 |
| Aug 17, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION OBSERVED THROUGHOUT THE BUILDING PVC PIPING BEING USED UNDER THE BATHROOM SINK VANITIES AND THROUGHOUT THE BASEMENT THIS IS CONTRARY TO PC 1101.10 PVC PIPING USED FOR WASTE PIPING WAS #39200751K | Dec 3, 2026 PENDING | $1,250 |
| Aug 19, 2024 | Construction CLASS - 2 CLOSET BUILT WITH EXCESSIVE STORAGE OF OFFICE MATERIAL INSIDE ELECTRICAL MECHANICAL ROOM LOCATED AT CELLAR/BASEMENT LEVEL AND WITHOUT DOB APPROVAL/ PERMITS., OBTAIN ALL PERMITS #39122374N | May 5, 2025 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 24, 2026 | CONSTRUCTION FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD @ EXP4 NEAR EXP3/4 PARAPET LOOSE/DELAMINATED MATERIAL ABOVE COURTYARD AREA. OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIE BLDG,PREPARE/FILE REPAIR DWGS,REPAIR BLDG UNDER PERMIT,START WORK BY 04/24/2026. COMPLETE/SIGN OFF WORK BY 06/24/26 #PI11101SB | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 17, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OBSERVED OBSTRUCTED SPRINKLER HEADS AND LACK OF SPRINKLER COVERAGE THIS IS CONTRARY TO BC903.3.3, WHICH REQUIRES AUTOMATIC SPRINKLERS TO BE INSTALLED WITH DUE REGARD TO OBSTRUCTIONS TH | Open |
| Aug 17, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OBSERVED THROUGHOUT THE BUILDING PVC PIPING BEING USED UNDER THE BATHROOM SINK VANITIES AND THROUGHOUT THE BASEMENT THIS IS CONTRARY TO PC 1101.10 PVC PIPING USED FOR WASTE PIPING WAS | Open |