8 floors · 48,002 sq ft · built 2011 · class H3 · owner of record: Sc Delancey Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2021-10-26 (Accepted). Agency page | Dec 31, 2026 in 46 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 48,002 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $99,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 463 days | No Cycle 10 report on record yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 777 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 5, 2025 | Elevators CLASS - 1 CLASS 1 ITEM: REPLACE FR3 2 AMP HALL BUTTON FUSE AND CORRECT PROBLEM. CLASS 2 ITEMS: BRAKE MAINTENANCE TAG EXPIRED. CLEAN ENTIRE PIT AREA. #39156128N | May 20, 2027 | $3,125 |
| Oct 6, 2024 | Construction CLASS - 2 WORK WITHOUT PERMIT. NOTED: FOUR CONSTRUCTION WORKERS DOING FLOOR EPOXY AFTER HOURS UNDER PERMIT # M01081119-I1-GC WITHOUT AN AFTER HOURS PERMIT ON SUNDAY., OBTAIN AFTER HOURS VARIANCE; OBTAIN AN AHV FOR ALL AF #39126716M | Jun 9, 2025 IN VIOLATION | $0 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#914564.REM:SUBMIT ACCEPTABLE REQUIRED T #37027614P | Apr 10, 2025 IN VIOLATION | $1,250 |
| Jun 27, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE & APPURTENANCES NOTE AT THE TIME OF INSPECTION OBSERVE PREVIOUSLY SUMMO #35458449M HAS NOT BEEN CORRECTED YET AS PER ALL DEFECTIVE CONDITION MENTION AT PREVIOUS SUMM #35466589Y | Sep 3, 2020 IN VIOLATION | $0 |
| Mar 10, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURENANCES.AS NOTEDBUILDING HAS VERTICAL CRACKING AT CORNERS THROUGHOUT FACADE.SPALLED BRICK EXPOSURE 1:4TH FLOOR CORNER.STEP CRACKING OR INTERIOR PARAPET WALL #35458449M | May 21, 2020 IN VIOLATION | $2,653 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #01925 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #01926 | DOB VIOLATION - ACTIVE |
| May 7, 2025 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS #00073 | DOB VIOLATION - ACTIVE |
| Jan 30, 2025 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #912014 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #01978 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #01977 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #06233 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #06234 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01006 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| May 7, 2025 | Facades FISPFCS CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Jan 30, 2025 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 4:36 AM ET. BBL 1003480036.