2 floors · 1 apartments · 1,224 sq ft · built 1945 · class A5 · owner of record: Nektalov, Zhanna
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 314 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 25, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL INSTALLED WATER ANDWASTE LINES FOR TOILET, SHOWER AND COMMERCIAL SINK; INSTALLED GAS LINEFOR GAS STOVE. REMEDY: OBTAIN REQUIRED PERMIT. #35729435N | Nov 10, 2026 PENDING | $2,500 |
| Aug 25, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FAILURE TO PROVIDE REQUIRED NATURAL LIGHT AND VENTILATION FOR EVERY BEDROOM NATURAL LIGHT AND VENTILATION FOR EVERY BEDROOM. NOTED: AT CELLAR LEVEL HAVING #35729438Z | Nov 10, 2026 PENDING | $2,500 |
| Aug 25, 2026 | Construction CLASS - 2 WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL INSTALLED ELECTRICAL LINES FOR LIGHTS, SWITCHES AND OUTLETS. REMEDY: OBTAIN REQUIRED PERMIT. #35729436P | Nov 10, 2026 PENDING | $1,250 |
| Aug 25, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF REQUIERED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE);27-366; BC 1021.1(2014 CODE), BC 1006.3(2022 CODE) FOR CLASS "A"-APT A #35729437R | Nov 10, 2026 PENDING | $2,500 |
| Aug 25, 2026 | Construction CLASS - 2 WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL HAVING CREATED PARTITION WALLS TO CREATE BATHROOM. REMEDY: OBTAIN REQUIRED PERMIT. #35729434L | Nov 10, 2026 PENDING | $1,250 |
| Aug 25, 2026 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPT OF BUILDINGS RECORDS. ILLEGAL OCCUPANCY NOTED: AT CELLAR LEVEL HAS BEEN CONVERTED/OCCUPIED ASA CLASS "A" APARTMENT WITH FULL KITCHEN, BATHROOM, BEDROOM. REMEDY: DI #35729433J | Nov 10, 2026 PENDING | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 25, 2026 | ECB | Construction: WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL INSTALLED WATER ANDWASTE LINES FOR TOILET, SHOWER AND COMMERCIAL SINK; INSTALLED GAS LINEFOR GAS STOVE. REMEDY: OBTAIN REQUIRED PERMIT. | Open |
| Aug 25, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FAILURE TO PROVIDE REQUIRED NATURAL LIGHT AND VENTILATION FOR EVERY BEDROOM NATURAL LIGHT AND VENTILATION FOR EVERY BEDROOM. NOTED: AT CELLAR LEVEL HAVING | Open |
| Aug 25, 2026 | ECB | Construction: WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL INSTALLED ELECTRICAL LINES FOR LIGHTS, SWITCHES AND OUTLETS. REMEDY: OBTAIN REQUIRED PERMIT. | Open |
| Aug 25, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF REQUIERED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE);27-366; BC 1021.1(2014 CODE), BC 1006.3(2022 CODE) FOR CLASS "A"-APT A | Open |
| Aug 25, 2026 | ECB | Construction: WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL HAVING CREATED PARTITION WALLS TO CREATE BATHROOM. REMEDY: OBTAIN REQUIRED PERMIT. | Open |
| Aug 25, 2026 | ECB | Construction: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPT OF BUILDINGS RECORDS. ILLEGAL OCCUPANCY NOTED: AT CELLAR LEVEL HAS BEEN CONVERTED/OCCUPIED ASA CLASS "A" APARTMENT WITH FULL KITCHEN, BATHROOM, BEDROOM. REMEDY: DI | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 6:26 PM ET. BBL 4067090063.