12 floors · 52,851 sq ft · built 1914 · class O6 · owner of record: Sino-American Cultural Center Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2020-08-13 (Accepted). Agency page | Dec 31, 2026 in 46 days | 1 of 1 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 52,851 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $718,080 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 463 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1142 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1260). Agency page | Dec 31, 2030 in 1507 days | Next due 2030 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B AND 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#904099.REM:FILE ACCEPTABLE REPORT. #37036750Y | Aug 13, 2026 ADMIT/IN-VIO | $0 |
| Feb 28, 2023 | Construction CLASS - 2 AC 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100FT OR MORE IN H #37025402Y | Jun 10, 2024 IN VIOLATION | $0 |
| Nov 1, 2021 | Construction CLASS - 2 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE #37022714J | Jul 7, 2022 IN VIOLATION | $0 |
| Nov 15, 2019 | Construction CLASS - 2 27-929.1 A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BUILDING #37016484M | Dec 10, 2020 IN VIOLATION | $0 |
| Oct 15, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #804100.RMDY: SUBMIT REQUIRED TECHNICAL REPORT. #37012986Y | Apr 5, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 6, 2026 | CONSTRUCTION FTM BLDG. OBSERVED ON EXP1: CRACKS IN TERRACOTTA @ MULTI FLRS & LOCAT; ON EXP3: BROKEN WINDOWSILL; BROKEN WINDOW PAIN. EXP4 E.ELEV: DAMAGED BROKEN WINDOWSILL; DMAGED CRACKED BRICK WORK. ROOF: DEFECTIVE, MISSING MORTAR JOINTS ON CHIMNEY; DAMAGED MISSING COPING STONE ON PARPET WALL REMDY: REPAIR AND/O #SR0503RF | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #03187 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #03161 | DOB VIOLATION - ACTIVE |
| Sep 18, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING. OBSERVED AT EXPOSURE 2 CRACK IN MASONRY LINTELS ON SEVERAL FLOORS. EXPOSURE 4 OBSERVED VERTICAL CRACK IN STONE WORK AT THE SOUTH EAST END OF BUILDING DETERIORATED BRICK AND MORTAR JOINTS. REMEDY: REPAIR AND REPLACE DAMAGE FACADE #SR10501DO | DOB VIOLATION - ACTIVE |
| Jul 17, 2024 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO THE HAZARDOUS CONDITIONS OBSERVED: BROKEN FIRE ESCAPE, RAILINGS RUSTED; DETERORATING & LOOSE FIRE ESCAPE @ MULTIPLE LOCATIONS ON EXP#3 (N.ELEVATION). REMEDY: IMMEDIATELY REPAIR DAMAGED/BROKEN FIRE ESCAPE. OWNER TO RETAIN NYS LICENSED PROFESSIONAL TO PROVIDE PRELIMINARY OW #FA10501YR | DOB VIOLATION - ACTIVE |
| Apr 25, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED I OBS ERVED ON EXP1 CRACKS IN MASONRY LINTELS ON SEVERAL FLOORS.ALSO CRACKS AND OPEN MORTARS JOINTS ON WATER TABLE ON THE 4TH FLOOR.EXP4 EAST E;EV ATION HAS VERTICAL CRACK IN STONE WORK AT THE SOUTHEAST END OF THE BUI LDING.DETERIORATE #SR0502RF | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #40138 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #06195 | DOB VIOLATION - ACTIVE |
| Feb 17, 2023 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #910782 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #02184 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #02183 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #02182 | DOB VIOLATION - ACTIVE |
| Sep 3, 2019 | SPRINKLER FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019 #NRF00434 | DOB VIOLATION - ACTIVE |
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00594 | DOB VIOLATION - ACTIVE |
| Aug 27, 2018 | FACADE SAFETY PROGRAM #HAZ87565 | DOB VIOLATION - ACTIVE |
| Jul 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 #01094 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Feb 17, 2023 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 3, 2019 | Sprinklers FTF-SP-FINAL | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 27, 2018 | Facades FISP CYCLE 8B UNSAFE REPORT FILED | Active |
| Oct 31, 2014 | Elevators EVCAT1 | Active |
| Mar 31, 2014 | Elevators EVCAT1 | Active |
| Dec 13, 2011 | Elevators EVCAT1 | Active |
| Oct 8, 2010 | Elevators VCAT1 | Active |
| Apr 2, 2007 | Elevators LL1081 | Active |
| Oct 1, 2005 | Elevators LL1081 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 3:28 PM ET. BBL 1012600028.