4 floors · 5 apartments · 5,300 sq ft · built 1910 · class S9 · owner of record: M. Hughes Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 29, 2015 | A | SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING SHOE SOUTH FIRE ESCAPE , 2nd STORY | May 4, 2015 |
| Sep 13, 2011 | B | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING ***MINIMUM 100 WATTS OF INCANDESCENT LIGHT REQUIRED*** | Oct 18, 2011 |
| Aug 4, 2009 | B | Apt 2/3 · SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF WATER DAMAGE CEILING IN THE BATHROOM LOCATED AT APT 2/3, 2nd STORY | Sep 8, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED DOUBLE CYLINDER LOCK METAL GATE STREET TO BUILDING | Aug 10, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED DOUBLE CYLINDER LOCK METAL GATE ENTRANCE TO BUILDING | Aug 10, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CEILING LIGHT FIXTURE AT PUBLIC HALL, 1st STORY | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CEILING LIGHT FIXTURE AT PUBLIC HALL, 4th STORY | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDING MATERIAL AT CEILING AND WALLS AT ALL STORIES AT PUBLIC HALL | Sep 8, 2009 |
| Aug 4, 2009 | A | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WALLS AT PUBLIC ALL STORIES | Nov 7, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER LOCK AT METAL GATE AT FRONT YARD | Aug 10, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF TORN AND DEFECTIVE FLOOR COVERING AT ALL STORIES (A TRIP HAZZARD) AT PUBLIC HALL | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOXED ELECTRIC WIRES AT CEILING LIGHT FIXTURES 1ST 2ND AND 4TH STORIES AT PUBLIC HALL | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD PANEL AT EAST WALL ALL STORIES AT PUBLIC HALL STAIRS | Sep 8, 2009 |
| Aug 4, 2009 | C | Apt 2/3 · SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SHEETROCK CEILING IN THE BATHROOM LOCATED AT APT 2/3, 2nd STORY | Aug 10, 2009 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 6:26 AM ET. BBL 3018330087.