1 floors · 3,200 sq ft · built 1950 · class E2 · owner of record: 149 Hamilton Ave. Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
None open.
| Issued | Violation | Status |
|---|---|---|
| Apr 21, 2017 | CONSTRUCTION FAILURE TO CORRECT UNLAWFUL ARTERIAL TRIPLE FACED GROUND SIGN STRUCTURE THAT EXCEEDS THE SURFACE AREA LIMITS IN AN M1-1 ZONE ERECTED & MAINTAINED W/O A PERMIT.ANY POSSIBLE NO CONFORMING USE OF THE SIGN STRUCTURE NOT LEGALLY ESTABLISHED OR CONTINUED PER ZR52-61 AS THE SIGN STRUCTURE WAS VACATE OR USE #SGSPO1EA | DOB VIOLATION - ACTIVE |
| Dec 18, 2015 | CONSTRUCTION FAILURE TO CORRECT UNLAWFUL ARTERIAL TRIPLE FACED GROUND SIGN STRUCTURE THAT EXCEEDS THE SURFACE ARE LIMITS IN AN M1-1 ZONE ERECTE & MAINTAINED W/O A PERMIT. ANY POSSIBLE UNCONFORMING USE OF THE SIGN STRUCTURE NOT LEGALLY ESTABLSIHED OR CONTINUED PER ZR52-61 AS THE SIGN STRUCTURE WAS VACANT OR USED #SGSSPO10VZ | DOB VIOLATION - ACTIVE |
| Dec 7, 2013 | CONSTRUCTION (28-502.4)UNREG #SGSTF13EC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 6) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 11:20 PM ET. BBL 3003670012.