3 floors · 10 apartments · 4,189 sq ft · built 1931 · class C1 · owner of record: 1480 Bryant Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 27, 2025 | Construction CLASS - 1 3303.4 HOUSEKEEPING AT TIME OF INSPECTION OF A 3-STORY BUILDING ACTIVE I NOTICED INADEQUATE HOUSEKEEPING REAR YARD EXP#3 LARGE AMOUNT OF DEBRIS PLYWOOD,SCAPE METAL,CONSTRUCTION BRICKS THIS CREATE UNSAFE WORKING #39536309R | Apr 27, 2026 IN VIOLATION | $2,500 |
| Jan 27, 2025 | Construction CLASS - 1 3301.7 DOCUMENTS TO BE KEPT ON SITE.AT TIME OF INSPECTION OF A 3-STORY BUILDING ACTIVE JOBSITE DURING MY INSPECTION UPON REQUESTING WORKERS FOR APPROVE DOCUMENT NONE WAS PROVIDE THIS CREATE UNSAFE WORK CONDITIO #39536310Y | Apr 27, 2026 IN VIOLATION | $1,250 |
| Jan 27, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION RESPONDING TO AN INCIDENT WHERE A WORKER FALL ROOF INTO REAR YARD APPROX. 30FT FDNY REPORTED WORKER FELL OF ROOF AND TAKEN TO HOSPITAL WITH SERIOUS INJURY GC FAIL TO PROPERTY NOTIFY THE DE #39536329Y | Feb 18, 2027 | $5,000 |
| Jan 27, 2025 | Construction CLASS - 1 AT TIME INSPECTION RESPONDING TO AN INCIDENT WERE A WORKER FALL OF ROOF LEVEL APPROX. 30FT GC FAIL TO HAVE SAFETY MEASURE IN PLACE 1-NO PARAPET WALL 2-NO CONTROL ACCESS 3-ROOF WAS WET AND SLIPPER 4-WORK HAD NO #39536343K | Feb 18, 2027 | $10,000 |
| Jan 27, 2025 | Construction CLASS - 1 RESPOND TO AN INCIDENT WERE A WORKER FELL OFF THE ROOF LEVEL APPROX. 30FT GC FAIL TO HAVE SAFETY MEASURES IN PLACE 1-OBSERVE NO GUARDRAIL AT ROOF 2-LADDER LEADING TO THE ROOF WAS REMOVED 3-WORKER WAS NO TITLED #39536315N | Feb 18, 2027 | $25,000 |
| Jan 27, 2025 | Site Safety CLASS - 1 3301.3 AT TIME OF INSPECTION OBSERVED 3-STORY BUILDING ACTIVE JOBSITE FAILURE TO DESIGNATE AND HAVE A CONSTRUCTION SUPERINTENDENT PRESENT AT SITE AS REQUIRED I NOTICED ALTERATION OF A 3 STORY CONVERTED TO 10 DW #39536306L | Feb 18, 2027 | $10,000 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 1, 2025 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. | Jan 4, 2026 |
| Oct 1, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Jan 4, 2026 |
| Oct 1, 2025 | A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX , | Jan 4, 2026 |
| Oct 1, 2025 | A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS , | Jan 4, 2026 |
| Oct 1, 2025 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. | Jan 4, 2026 |
| Oct 1, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE APPROVE TYPE WIREGLASS AT SKYLIGHT AT 1st PUBLIC HALL BULKHEAD FROM NORTH | Nov 5, 2025 |
| Oct 1, 2025 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. | Jan 4, 2026 |
| Oct 1, 2025 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR ,, | Jan 4, 2026 |
| Oct 1, 2025 | B | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF BX CABLE AT NORTH WALL AT PUBLIC HALL AT BASEMENT STORY | Nov 5, 2025 |
| Sep 8, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Dec 12, 2025 |
| Sep 8, 2025 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME READILY ACCESSIBLE FOR SIGNATURE, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT FRAME MISSING AT PUBLIC HALL, 1st STORY | Dec 12, 2025 |
| Sep 8, 2025 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Dec 12, 2025 |
| Sep 8, 2025 | A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX SIGNAGE MISSING AT PUBLIC HALL, 1st STORY | Dec 12, 2025 |
| Sep 8, 2025 | A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS SIGNAGE MISSING | Dec 12, 2025 |
| Sep 8, 2025 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Dec 12, 2025 |
| Sep 8, 2025 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Dec 12, 2025 |
| Sep 8, 2025 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGNAGE MISSING AT PUBLIC HALL, 1st STORY | Sep 14, 2025 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 6:03 PM ET. BBL 2030000057.